Chiltern Railways Delay Repay
What Chiltern Railways pays back when a train is late, set beside how often its trains really are late.
The rules
| Arrival delay | Share of a single ticket |
|---|---|
| 15 to 29 minutes | 25% |
| 30 to 59 minutes | 50% |
| 60 minutes or more | 100% |
Delay Repay and how often delays happen
Chiltern Railways pays Delay Repay for a delay of 15 minutes or more at your destination.
Over the last 13 four-week periods to Period 7 of 2026-27, Chiltern Railways had 1,034,043 scheduled stops. Of the stops with a recorded arrival, 87.7% came within three minutes of the timetable, so 12.3% did not, about 1 in 8.
The official measure treats any arrival more than three minutes behind as late, so for Chiltern Railways the 12.3% is a ceiling on how often a delay of 15 minutes or more happens at a stop, not a count of claims.
A year ago, over the previous 13 periods, Chiltern Railways managed 89.8% within three minutes. It now manages 87.7%, which is 2.1 percentage points worse, while cancellations moved from 1.5% to 1.4% of scheduled stops.
Among the stations where Chiltern Railways runs trains, the oldest are Oxford (1844), Banbury (1850) and Bicester Village (1850), and the newest are Oxford Parkway (2015), Stratford-upon-Avon Parkway (2013) and Aylesbury Vale Parkway (2008).
The northernmost stations in the Chiltern Railways network are The Hawthorns and Smethwick Galton Bridge, and the southernmost are London Marylebone and Wembley Stadium.
On the Chiltern Railways network, the stations furthest from their nearest neighbour are Haddenham and Thame Parkway (8.7 km from Monks Risborough), Great Missenden (7.0 km from Wendover) and High Wycombe (6.3 km from Bourne End).
How punctuality has moved
Delay Repay across train companies
| Operator | Pays from | First band | Within 3 min | Cancelled |
|---|---|---|---|---|
| Greater Anglia | 15 min | 25% | 90.3% | 1.7% |
| Chiltern Railways | 15 min | 25% | 87.7% | 1.4% |
| Transport for Wales | 15 min | 25% | 85.0% | 3.0% |
| Southeastern | 15 min | 25% | 84.2% | 1.7% |
| GTR (Gatwick Express, Great Northern, Southern, Thameslink) | 15 min | 25% | 82.9% | 4.7% |
| South Western Railway | 15 min | 25% | 82.6% | 3.5% |
| West Midlands Railway | 15 min | 25% | 81.1% | 3.9% |
| Great Western Railway | 15 min | 25% | 75.7% | 4.0% |
| East Midlands Railway | 15 min | 25% | 74.6% | 3.7% |
| TransPennine Express | 15 min | 25% | 68.8% | 3.3% |
| Avanti | 15 min | 25% | 55.2% | 5.7% |
| Merseyrail | over 30 min | 100% | 91.5% | 2.0% |
| ScotRail | 30 min | 50% | 87.9% | 1.6% |
| Caledonian Sleeper | 30 min | – | 76.3% | 2.3% |
| Hull Trains | 30 min | 50% | 68.2% | 0.9% |
| LNER | 30 min | 50% | 67.6% | 2.9% |
| Lumo (East Coast) | 30 min | 50% | 66.7% | 3.0% |
| CrossCountry | 30 min | 50% | 63.2% | 5.9% |
| Lumo (West Coast) | 30 min | 50% | 60.0% | 5.1% |
| Grand Central | 60 min | 50% | 62.2% | 2.3% |
Where these rules come from
Rules checked on 2026-11-24 against the operator's own page, Chiltern Railways: Claiming Compensation.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out