Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

London Marylebone

MYBLondonManaged by Chiltern Railways

On time, last 13 periods88.6%Great Britain: 83.6%
Cancelled1.3%Great Britain: 3.2%
Stops a day250Scheduled, on average
Punctuality rank675th of 2,374Among ranked stations

How this station is performing

London Marylebone had 91,131 scheduled stops to Period 7 of 2026-27, about 250 a day. 88.6% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.

London Marylebone opened on 15 March 1899, 127 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Euston is the oldest (1837) and Tottenham Court Road the newest (2022), with London Marylebone in between.

The nearest stations to London Marylebone are London Paddington (1.2 km south-west), Bond Street (1.7 km south-east), London Euston (2.1 km east), South Hampstead (2.2 km north-west) and Tottenham Court Road (2.4 km south-east). 118 stations lie within 10 km in all. Of the five, South Hampstead is the most punctual at 92.6% and London Euston the least at 72.4%, with London Marylebone on 88.6%.

London Marylebone is named after London, a city, home to about 8,799,728 people, but the station stands 3.1 km from its centre.

Compared with 3 stations of a similar size in London, London Marylebone is the most punctual, at 88.6%. The comparison group includes Twickenham (87.8%), Blackheath (87.6%) and West Ealing (87.6%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 89.6%Period 2 of 2023-24: 93.9%Period 3 of 2023-24: 92.1%Period 4 of 2023-24: 94.8%Period 5 of 2023-24: 94.3%Period 6 of 2023-24: 94.7%Period 7 of 2023-24: 92.3%Period 8 of 2023-24: 92.5%Period 9 of 2023-24: 90.5%Period 10 of 2023-24: 92.4%Period 11 of 2023-24: 88.8%Period 12 of 2023-24: 91.2%Period 13 of 2023-24: 94.0%Period 1 of 2024-25: 95.5%Period 2 of 2024-25: 94.0%Period 3 of 2024-25: 92.6%Period 4 of 2024-25: 92.6%Period 5 of 2024-25: 90.8%Period 6 of 2024-25: 92.9%Period 7 of 2024-25: 85.7%Period 8 of 2024-25: 88.6%Period 9 of 2024-25: 86.8%Period 10 of 2024-25: 91.8%Period 11 of 2024-25: 92.7%Period 12 of 2024-25: 93.7%Period 13 of 2024-25: 94.6%Period 1 of 2025-26: 94.0%Period 2 of 2025-26: 90.8%Period 3 of 2025-26: 91.1%Period 4 of 2025-26: 89.1%Period 5 of 2025-26: 90.3%Period 6 of 2025-26: 91.4%Period 7 of 2025-26: 91.4%Period 8 of 2025-26: 88.0%Period 9 of 2025-26: 87.6%Period 10 of 2025-26: 89.4%Period 11 of 2025-26: 90.3%Period 12 of 2025-26: 92.3%Period 13 of 2025-26: 92.2%Period 1 of 2026-27: 92.0%Period 2 of 2026-27: 89.0%Period 3 of 2026-27: 87.1%Period 4 of 2026-27: 87.2%Period 5 of 2026-27: 86.0%Period 6 of 2026-27: 84.8%Period 7 of 2026-27: 85.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.5%Period 2 of 2023-24: 0.6%Period 3 of 2023-24: 0.6%Period 4 of 2023-24: 0.4%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 2.2%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 0.9%Period 10 of 2023-24: 2.3%Period 11 of 2023-24: 3.2%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 1.3%Period 1 of 2024-25: 0.4%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 1.2%Period 4 of 2024-25: 1.1%Period 5 of 2024-25: 2.4%Period 6 of 2024-25: 1.5%Period 7 of 2024-25: 5.1%Period 8 of 2024-25: 1.8%Period 9 of 2024-25: 1.6%Period 10 of 2024-25: 3.5%Period 11 of 2024-25: 0.8%Period 12 of 2024-25: 2.8%Period 13 of 2024-25: 0.4%Period 1 of 2025-26: 0.7%Period 2 of 2025-26: 0.5%Period 3 of 2025-26: 1.6%Period 4 of 2025-26: 1.4%Period 5 of 2025-26: 1.5%Period 6 of 2025-26: 1.9%Period 7 of 2025-26: 1.1%Period 8 of 2025-26: 1.0%Period 9 of 2025-26: 2.9%Period 10 of 2025-26: 0.7%Period 11 of 2025-26: 1.2%Period 12 of 2025-26: 0.4%Period 13 of 2025-26: 2.3%Period 1 of 2026-27: 0.9%Period 2 of 2026-27: 0.9%Period 3 of 2026-27: 1.5%Period 4 of 2026-27: 1.3%Period 5 of 2026-27: 1.4%Period 6 of 2026-27: 1.5%Period 7 of 2026-27: 1.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways91,13188.6%1.3%

Operators with their own page for this station are linked to it.

Late train at London Marylebone? Delay Repay

These operators call at London Marylebone and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-277,15585.1%1.0%
Period 6 of 2026-276,92784.8%1.5%
Period 5 of 2026-277,24686.0%1.4%
Period 4 of 2026-277,32687.2%1.3%
Period 3 of 2026-276,68087.1%1.5%
Period 2 of 2026-277,01589.0%0.9%
Period 1 of 2026-277,92092.0%0.9%
Period 13 of 2025-267,18292.2%2.3%
Period 12 of 2025-266,99192.3%0.4%
Period 11 of 2025-266,71690.3%1.2%
Period 10 of 2025-266,09989.4%0.7%
Period 9 of 2025-266,93487.6%2.9%
Period 8 of 2025-266,94088.0%1.0%

Time of year

75%80%85%90%95%P1: 92.6%1P2: 91.8%2P3: 90.7%3P4: 90.7%4P5: 90.0%5P6: 90.9%6P7: 88.5%7P8: 89.7%8P9: 88.2%9P10: 91.2%10P11: 90.7%11P12: 92.4%12P13: 93.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Twickenham92,76087.8%2.9%
Blackheath88,95787.6%1.8%
West Ealing94,03887.6%4.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out