Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Gerrards Cross

GERSouth EastManaged by Chiltern Railways

On time, last 13 periods89.7%Great Britain: 83.6%
Cancelled1.5%Great Britain: 3.2%
Stops a day117Scheduled, on average
Punctuality rank556th of 2,374Among ranked stations

How this station is performing

Gerrards Cross had 42,685 scheduled stops to Period 7 of 2026-27, about 117 a day. 89.7% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.

Gerrards Cross opened on 2 April 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Chorleywood is the oldest (1889) and Seer Green and Jordans the newest (1914), with Gerrards Cross in between.

The nearest stations to Gerrards Cross are Denham Golf Club (2.8 km east), Denham (4.2 km east), Seer Green and Jordans (4.3 km north-west), Beaconsfield (6.6 km west) and Chorleywood (7.7 km north). 12 stations lie within 10 km in all. Of the five, Denham Golf Club is the most punctual at 90.4% and Chorleywood the least at 85.6%, with Gerrards Cross on 89.7%.

Gerrards Cross takes its name from a town called Gerrards Cross, home to about 8,451 people, and the station stands 0.1 km from its centre.

Compared with 3 stations of a similar size in South East, Gerrards Cross is the most punctual, at 89.7%. The comparison group includes Newbury (77.2%), Littlehampton (83.3%) and Portchester (75.9%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 85.8%Period 2 of 2023-24: 91.3%Period 3 of 2023-24: 90.7%Period 4 of 2023-24: 93.7%Period 5 of 2023-24: 94.6%Period 6 of 2023-24: 92.5%Period 7 of 2023-24: 93.6%Period 8 of 2023-24: 94.2%Period 9 of 2023-24: 91.2%Period 10 of 2023-24: 92.4%Period 11 of 2023-24: 88.9%Period 12 of 2023-24: 90.0%Period 13 of 2023-24: 92.3%Period 1 of 2024-25: 94.3%Period 2 of 2024-25: 93.1%Period 3 of 2024-25: 92.5%Period 4 of 2024-25: 90.3%Period 5 of 2024-25: 90.1%Period 6 of 2024-25: 92.7%Period 7 of 2024-25: 85.1%Period 8 of 2024-25: 90.6%Period 9 of 2024-25: 90.3%Period 10 of 2024-25: 93.1%Period 11 of 2024-25: 93.6%Period 12 of 2024-25: 93.9%Period 13 of 2024-25: 94.1%Period 1 of 2025-26: 94.1%Period 2 of 2025-26: 92.0%Period 3 of 2025-26: 88.8%Period 4 of 2025-26: 89.3%Period 5 of 2025-26: 88.9%Period 6 of 2025-26: 90.3%Period 7 of 2025-26: 92.1%Period 8 of 2025-26: 90.4%Period 9 of 2025-26: 88.9%Period 10 of 2025-26: 90.7%Period 11 of 2025-26: 91.8%Period 12 of 2025-26: 92.8%Period 13 of 2025-26: 93.4%Period 1 of 2026-27: 93.0%Period 2 of 2026-27: 89.8%Period 3 of 2026-27: 87.9%Period 4 of 2026-27: 86.4%Period 5 of 2026-27: 85.7%Period 6 of 2026-27: 86.3%Period 7 of 2026-27: 88.2%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 2.4%Period 2 of 2023-24: 1.0%Period 3 of 2023-24: 0.9%Period 4 of 2023-24: 0.5%Period 5 of 2023-24: 1.1%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 2.2%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 1.4%Period 10 of 2023-24: 2.3%Period 11 of 2023-24: 5.0%Period 12 of 2023-24: 2.1%Period 13 of 2023-24: 1.2%Period 1 of 2024-25: 0.6%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 1.0%Period 4 of 2024-25: 1.5%Period 5 of 2024-25: 2.2%Period 6 of 2024-25: 2.0%Period 7 of 2024-25: 5.6%Period 8 of 2024-25: 1.7%Period 9 of 2024-25: 2.6%Period 10 of 2024-25: 3.2%Period 11 of 2024-25: 0.8%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 0.8%Period 2 of 2025-26: 0.8%Period 3 of 2025-26: 1.9%Period 4 of 2025-26: 1.0%Period 5 of 2025-26: 1.7%Period 6 of 2025-26: 1.2%Period 7 of 2025-26: 1.2%Period 8 of 2025-26: 1.1%Period 9 of 2025-26: 3.3%Period 10 of 2025-26: 0.7%Period 11 of 2025-26: 1.2%Period 12 of 2025-26: 0.4%Period 13 of 2025-26: 2.3%Period 1 of 2026-27: 1.2%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 1.8%Period 4 of 2026-27: 1.5%Period 5 of 2026-27: 1.9%Period 6 of 2026-27: 1.0%Period 7 of 2026-27: 1.2%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways42,68589.7%1.5%

Operators with their own page for this station are linked to it.

Late train at Gerrards Cross? Delay Repay

These operators call at Gerrards Cross and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,28988.2%1.2%
Period 6 of 2026-273,11186.3%1.0%
Period 5 of 2026-273,32185.7%1.9%
Period 4 of 2026-273,33886.4%1.5%
Period 3 of 2026-273,04687.9%1.8%
Period 2 of 2026-273,28889.8%1.3%
Period 1 of 2026-273,79993.0%1.2%
Period 13 of 2025-263,52093.4%2.3%
Period 12 of 2025-263,29392.8%0.4%
Period 11 of 2025-263,16191.8%1.2%
Period 10 of 2025-263,05190.7%0.7%
Period 9 of 2025-263,20888.9%3.3%
Period 8 of 2025-263,26090.4%1.1%

Time of year

75%80%85%90%95%P1: 91.8%1P2: 91.5%2P3: 90.0%3P4: 89.8%4P5: 89.7%5P6: 90.4%6P7: 89.7%7P8: 91.7%8P9: 90.1%9P10: 92.1%10P11: 91.6%11P12: 92.3%12P13: 93.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Newbury42,12177.2%2.7%
Littlehampton41,89883.3%2.8%
Portchester43,56375.9%4.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out