Dorridge
DDGWest MidlandsManaged by Chiltern Railways
How this station is performing
Dorridge had 46,056 scheduled stops to Period 7 of 2026-27, about 126 a day. 85.5% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Dorridge opened on 1 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dorridge is the oldest; the next oldest, Lapworth, dates from 1852.
The nearest stations to Dorridge are Widney Manor (3.0 km north-west), Lapworth (3.8 km south-east), Solihull (5.3 km north-west), The Lakes (Warks) (6.4 km west) and Wood End (6.9 km south-west). 19 stations lie within 10 km in all. Of the five, Widney Manor is the most punctual at 90.1% and The Lakes (Warks) the least at 83.9%, with Dorridge on 85.5%.
Dorridge takes its name from a Village called Dorridge, home to about 11,140 people, and the station stands 0.2 km from its centre.
3 operators call at Dorridge: Chiltern Railways (83.0%, 53% of stops), West Midlands Railway (88.4%, 47% of stops) and CrossCountry (–, 0% of stops). The operator you travel with matters: West Midlands Railway reaches 88.4% within three minutes while Chiltern Railways manages 83.0%, a gap of 5.4 percentage points.
1 of 3 stations of a similar size in West Midlands are more punctual than Dorridge on 85.5%. The comparison group includes Solihull (87.3%), Lichfield Trent Valley (67.3%) and Erdington (81.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 24,182 | 83.0% | 1.2% |
| West Midlands Railway | 21,873 | 88.4% | 4.1% |
| CrossCountry | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dorridge? Delay Repay
These operators call at Dorridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,565 | 82.0% | 1.3% |
| Period 6 of 2026-27 | 3,535 | 83.6% | 2.1% |
| Period 5 of 2026-27 | 3,273 | 80.2% | 4.5% |
| Period 4 of 2026-27 | 3,419 | 80.3% | 3.6% |
| Period 3 of 2026-27 | 3,429 | 83.0% | 2.2% |
| Period 2 of 2026-27 | 3,477 | 84.2% | 2.2% |
| Period 1 of 2026-27 | 4,114 | 89.6% | 2.2% |
| Period 13 of 2025-26 | 3,850 | 89.2% | 3.0% |
| Period 12 of 2025-26 | 3,541 | 90.5% | 1.2% |
| Period 11 of 2025-26 | 3,510 | 89.7% | 2.7% |
| Period 10 of 2025-26 | 3,229 | 87.4% | 2.2% |
| Period 9 of 2025-26 | 3,507 | 85.6% | 2.9% |
| Period 8 of 2025-26 | 3,607 | 84.4% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Solihull | 46,026 | 87.3% | 2.7% |
| Lichfield Trent Valley | 45,420 | 67.3% | 5.4% |
| Erdington | 46,978 | 81.9% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out