Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Dorridge

DDGWest MidlandsManaged by Chiltern Railways

On time, last 13 periods85.5%Great Britain: 83.6%
Cancelled2.6%Great Britain: 3.2%
Stops a day126Scheduled, on average
Punctuality rank1019th of 2,374Among ranked stations

How this station is performing

Dorridge had 46,056 scheduled stops to Period 7 of 2026-27, about 126 a day. 85.5% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.

Dorridge opened on 1 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dorridge is the oldest; the next oldest, Lapworth, dates from 1852.

The nearest stations to Dorridge are Widney Manor (3.0 km north-west), Lapworth (3.8 km south-east), Solihull (5.3 km north-west), The Lakes (Warks) (6.4 km west) and Wood End (6.9 km south-west). 19 stations lie within 10 km in all. Of the five, Widney Manor is the most punctual at 90.1% and The Lakes (Warks) the least at 83.9%, with Dorridge on 85.5%.

Dorridge takes its name from a Village called Dorridge, home to about 11,140 people, and the station stands 0.2 km from its centre.

3 operators call at Dorridge: Chiltern Railways (83.0%, 53% of stops), West Midlands Railway (88.4%, 47% of stops) and CrossCountry (–, 0% of stops). The operator you travel with matters: West Midlands Railway reaches 88.4% within three minutes while Chiltern Railways manages 83.0%, a gap of 5.4 percentage points.

1 of 3 stations of a similar size in West Midlands are more punctual than Dorridge on 85.5%. The comparison group includes Solihull (87.3%), Lichfield Trent Valley (67.3%) and Erdington (81.9%).

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 80.7%Period 2 of 2023-24: 85.9%Period 3 of 2023-24: 89.6%Period 4 of 2023-24: 91.0%Period 5 of 2023-24: 90.1%Period 6 of 2023-24: 87.9%Period 7 of 2023-24: 87.3%Period 8 of 2023-24: 86.0%Period 9 of 2023-24: 81.8%Period 10 of 2023-24: 86.6%Period 11 of 2023-24: 87.7%Period 12 of 2023-24: 89.3%Period 13 of 2023-24: 91.7%Period 1 of 2024-25: 92.6%Period 2 of 2024-25: 90.2%Period 3 of 2024-25: 91.3%Period 4 of 2024-25: 89.1%Period 5 of 2024-25: 88.5%Period 6 of 2024-25: 89.9%Period 7 of 2024-25: 86.3%Period 8 of 2024-25: 87.0%Period 9 of 2024-25: 81.1%Period 10 of 2024-25: 86.6%Period 11 of 2024-25: 89.7%Period 12 of 2024-25: 91.7%Period 13 of 2024-25: 91.2%Period 1 of 2025-26: 91.3%Period 2 of 2025-26: 87.7%Period 3 of 2025-26: 87.8%Period 4 of 2025-26: 85.6%Period 5 of 2025-26: 85.2%Period 6 of 2025-26: 87.2%Period 7 of 2025-26: 90.9%Period 8 of 2025-26: 84.4%Period 9 of 2025-26: 85.6%Period 10 of 2025-26: 87.4%Period 11 of 2025-26: 89.7%Period 12 of 2025-26: 90.5%Period 13 of 2025-26: 89.2%Period 1 of 2026-27: 89.6%Period 2 of 2026-27: 84.2%Period 3 of 2026-27: 83.0%Period 4 of 2026-27: 80.3%Period 5 of 2026-27: 80.2%Period 6 of 2026-27: 83.6%Period 7 of 2026-27: 82.0%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 3.7%Period 2 of 2023-24: 2.1%Period 3 of 2023-24: 2.4%Period 4 of 2023-24: 2.5%Period 5 of 2023-24: 6.2%Period 6 of 2023-24: 3.1%Period 7 of 2023-24: 3.9%Period 8 of 2023-24: 3.3%Period 9 of 2023-24: 4.4%Period 10 of 2023-24: 6.7%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 2.6%Period 1 of 2024-25: 2.1%Period 2 of 2024-25: 2.5%Period 3 of 2024-25: 2.5%Period 4 of 2024-25: 1.7%Period 5 of 2024-25: 5.2%Period 6 of 2024-25: 3.3%Period 7 of 2024-25: 5.0%Period 8 of 2024-25: 2.8%Period 9 of 2024-25: 4.2%Period 10 of 2024-25: 3.8%Period 11 of 2024-25: 2.8%Period 12 of 2024-25: 1.2%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 1.6%Period 2 of 2025-26: 1.6%Period 3 of 2025-26: 2.1%Period 4 of 2025-26: 3.4%Period 5 of 2025-26: 1.9%Period 6 of 2025-26: 1.7%Period 7 of 2025-26: 0.7%Period 8 of 2025-26: 3.7%Period 9 of 2025-26: 2.9%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 2.7%Period 12 of 2025-26: 1.2%Period 13 of 2025-26: 3.0%Period 1 of 2026-27: 2.2%Period 2 of 2026-27: 2.2%Period 3 of 2026-27: 2.2%Period 4 of 2026-27: 3.6%Period 5 of 2026-27: 4.5%Period 6 of 2026-27: 2.1%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways24,18283.0%1.2%
West Midlands Railway21,87388.4%4.1%
CrossCountry1––

Operators with their own page for this station are linked to it.

Late train at Dorridge? Delay Repay

These operators call at Dorridge and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,56582.0%1.3%
Period 6 of 2026-273,53583.6%2.1%
Period 5 of 2026-273,27380.2%4.5%
Period 4 of 2026-273,41980.3%3.6%
Period 3 of 2026-273,42983.0%2.2%
Period 2 of 2026-273,47784.2%2.2%
Period 1 of 2026-274,11489.6%2.2%
Period 13 of 2025-263,85089.2%3.0%
Period 12 of 2025-263,54190.5%1.2%
Period 11 of 2025-263,51089.7%2.7%
Period 10 of 2025-263,22987.4%2.2%
Period 9 of 2025-263,50785.6%2.9%
Period 8 of 2025-263,60784.4%3.7%

Time of year

75%80%85%90%95%P1: 88.6%1P2: 87.0%2P3: 87.9%3P4: 86.4%4P5: 86.0%5P6: 87.1%6P7: 86.6%7P8: 85.8%8P9: 82.9%9P10: 86.9%10P11: 89.1%11P12: 90.5%12P13: 90.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in West Midlands

StationScheduled stopsWithin 3 minCancelled
Solihull46,02687.3%2.7%
Lichfield Trent Valley45,42067.3%5.4%
Erdington46,97881.9%2.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out