Oxford
OXFSouth EastManaged by Great Western Railway
How this station is performing
Oxford had 88,564 scheduled stops to Period 7 of 2026-27, about 243 a day. 76.0% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Oxford opened on 12 June 1844. It was moved to the site it uses now on 1 October 1852. Of the 5 stations nearest to it with a known opening date, Oxford is the oldest; the next oldest, Culham, dates from 1844.
The nearest stations to Oxford are Oxford Parkway (5.6 km north), Radley (7.8 km south), Islip (8.4 km north), Hanborough (10.6 km north-west) and Culham (11.3 km south). 3 stations lie within 10 km in all. Of the five, Islip is the most punctual at 92.5% and Hanborough the least at 60.5%, with Oxford on 76.0%.
Oxford is one of 2 stations named after a city called Oxford, home to about 147,500 people; this one stands 0.9 km from its centre.
3 operators call at Oxford: Great Western Railway (72.1%, 51% of stops), Chiltern Railways (92.5%, 30% of stops) and CrossCountry (59.0%, 19% of stops). The operator you travel with matters: Chiltern Railways reaches 92.5% within three minutes while CrossCountry manages 59.0%, a gap of 33.5 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Oxford on 76.0%. The comparison group includes Didcot Parkway (70.8%), Tonbridge (76.2%) and Chatham (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 45,435 | 72.1% | 4.6% |
| Chiltern Railways | 26,522 | 92.5% | 1.6% |
| CrossCountry | 16,607 | 59.0% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Oxford? Delay Repay
These operators call at Oxford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,158 | 74.4% | 4.3% |
| Period 6 of 2026-27 | 7,156 | 70.6% | 4.2% |
| Period 5 of 2026-27 | 7,118 | 69.8% | 6.5% |
| Period 4 of 2026-27 | 6,996 | 68.9% | 4.7% |
| Period 3 of 2026-27 | 6,841 | 74.5% | 4.8% |
| Period 2 of 2026-27 | 6,866 | 75.9% | 3.7% |
| Period 1 of 2026-27 | 7,670 | 79.6% | 3.0% |
| Period 13 of 2025-26 | 7,403 | 83.5% | 2.3% |
| Period 12 of 2025-26 | 5,852 | 84.3% | 2.5% |
| Period 11 of 2025-26 | 6,617 | 82.2% | 2.9% |
| Period 10 of 2025-26 | 6,002 | 78.2% | 4.2% |
| Period 9 of 2025-26 | 6,396 | 71.4% | 4.1% |
| Period 8 of 2025-26 | 6,489 | 74.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Didcot Parkway | 88,376 | 70.8% | 3.4% |
| Tonbridge | 89,026 | 76.2% | 1.5% |
| Chatham | 91,440 | 79.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out