Islip
ISPSouth EastManaged by Chiltern Railways
How this station is performing
Islip had 7,816 scheduled stops to Period 7 of 2026-27, about 22 a day. 92.5% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Islip opened on 1 October 1850 and closed to passengers on 1 January 1968. It reopened on 15 May 1989, 37 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Oxford is the oldest (1844) and Oxford Parkway the newest (2015), with Islip in between.
The nearest stations to Islip are Oxford Parkway (3.6 km south-west), Tackley (7.4 km north-west), Oxford (8.4 km south), Hanborough (9.3 km west) and Bicester Village (9.5 km north-east). 5 stations lie within 10 km in all. Of the five, Bicester Village is the most punctual at 92.6% and Hanborough the least at 60.5%, with Islip on 92.5%.
Islip is one of 2 stations named after a Village called Islip, home to about 668 people; this one stands 0.4 km from its centre.
In South East, Islip ranks 36th of 409 ranked stations. Its 92.5% is 11.3 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Islip is the most punctual, at 92.5%. The comparison group includes Heyford (76.1%), Chilworth (79.8%) and Dorking West (81.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 7,816 | 92.5% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Islip? Delay Repay
These operators call at Islip and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 592 | 91.5% | 0.8% |
| Period 6 of 2026-27 | 594 | 90.5% | 1.2% |
| Period 5 of 2026-27 | 591 | 89.5% | 2.2% |
| Period 4 of 2026-27 | 594 | 91.1% | 1.3% |
| Period 3 of 2026-27 | 591 | 92.1% | 1.9% |
| Period 2 of 2026-27 | 587 | 92.0% | 0.9% |
| Period 1 of 2026-27 | 680 | 92.4% | 0.7% |
| Period 13 of 2025-26 | 659 | 94.3% | 2.0% |
| Period 12 of 2025-26 | 592 | 95.8% | 0.0% |
| Period 11 of 2025-26 | 611 | 95.0% | 1.1% |
| Period 10 of 2025-26 | 537 | 94.5% | 1.1% |
| Period 9 of 2025-26 | 594 | 91.5% | 2.7% |
| Period 8 of 2025-26 | 594 | 92.0% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heyford | 7,527 | 76.1% | 2.2% |
| Chilworth | 8,256 | 79.8% | 6.7% |
| Dorking West | 8,524 | 81.2% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out