Warwick Parkway
WRPWest MidlandsManaged by Chiltern Railways
How this station is performing
Warwick Parkway had 23,780 scheduled stops to Period 7 of 2026-27, about 65 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Warwick Parkway opened on 8 October 2000, 26 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Warwick Parkway is the newest; the oldest, Kenilworth, opened in 1844.
The nearest stations to Warwick Parkway are Warwick (2.1 km east), Hatton (4.3 km west), Leamington Spa (5.2 km east), Claverdon (5.8 km west) and Kenilworth (6.9 km north-east). 6 stations lie within 10 km in all. Of the five, Claverdon is the most punctual at 89.7% and Leamington Spa the least at 76.2%, with Warwick Parkway on 82.8%.
Warwick Parkway is a parkway station, 1.7 km from the centre of Warwick, a county town, home to about 32,719 people, which gives it its name.
2 operators call at Warwick Parkway: Chiltern Railways (82.7%, 95% of stops) and West Midlands Railway (85.2%, 5% of stops). They are close together, with West Midlands Railway leading on 85.2% and Chiltern Railways trailing on 82.7%, a gap of 2.5 percentage points.
Compared with 3 stations of a similar size in West Midlands, Warwick Parkway is the most punctual, at 82.8%. The comparison group includes Smethwick Rolfe Street (79.2%), Dudley Port (74.6%) and Tipton (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 22,557 | 82.7% | 1.1% |
| West Midlands Railway | 1,223 | 85.2% | 5.7% |
Operators with their own page for this station are linked to it.
Late train at Warwick Parkway? Delay Repay
These operators call at Warwick Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,821 | 79.4% | 0.6% |
| Period 6 of 2026-27 | 1,789 | 78.6% | 1.2% |
| Period 5 of 2026-27 | 1,765 | 77.1% | 1.6% |
| Period 4 of 2026-27 | 1,802 | 76.2% | 2.1% |
| Period 3 of 2026-27 | 1,761 | 78.6% | 1.1% |
| Period 2 of 2026-27 | 1,809 | 82.0% | 1.2% |
| Period 1 of 2026-27 | 2,128 | 88.2% | 0.9% |
| Period 13 of 2025-26 | 1,940 | 87.6% | 1.6% |
| Period 12 of 2025-26 | 1,804 | 88.6% | 0.6% |
| Period 11 of 2025-26 | 1,809 | 87.5% | 1.2% |
| Period 10 of 2025-26 | 1,709 | 84.4% | 1.3% |
| Period 9 of 2025-26 | 1,765 | 83.8% | 1.9% |
| Period 8 of 2025-26 | 1,878 | 82.8% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Smethwick Rolfe Street | 23,816 | 79.2% | 2.7% |
| Dudley Port | 23,817 | 74.6% | 2.8% |
| Tipton | 23,906 | 77.5% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out