Bicester North
BCSSouth EastManaged by Chiltern Railways
How this station is performing
Bicester North had 23,348 scheduled stops to Period 7 of 2026-27, about 64 a day. 82.4% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Bicester North opened on 1 July 1910, 116 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bicester Village is the oldest (1850) and Oxford Parkway the newest (2015), with Bicester North in between.
The nearest stations to Bicester North are Bicester Village (1.2 km south), Heyford (10.4 km west), Tackley (10.4 km west), Islip (10.5 km south-west) and Oxford Parkway (14.0 km south-west). 1 stations lie within 10 km in all. Of the five, Bicester Village is the most punctual at 92.6% and Heyford the least at 76.1%, with Bicester North on 82.4%.
Bicester North is named after Bicester, a market town, home to about 37,002 people, but the station stands 0.4 km from its centre.
Bicester North has slipped a little, from 86.5% within three minutes in the previous 13 periods to 82.4% in the latest 13, a fall of 4.1 percentage points. Cancellations held steady at 1.0% of scheduled stops, against 0.8% before.
2 of 3 stations of a similar size in South East are more punctual than Bicester North on 82.4%. The comparison group includes Pangbourne (81.0%), Claygate (84.8%) and Cobham and Stoke D'abernon (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 23,348 | 82.4% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Bicester North? Delay Repay
These operators call at Bicester North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,791 | 81.6% | 0.7% |
| Period 6 of 2026-27 | 1,758 | 76.4% | 0.9% |
| Period 5 of 2026-27 | 1,770 | 74.3% | 1.4% |
| Period 4 of 2026-27 | 1,788 | 73.9% | 1.4% |
| Period 3 of 2026-27 | 1,696 | 79.3% | 0.8% |
| Period 2 of 2026-27 | 1,795 | 83.9% | 0.6% |
| Period 1 of 2026-27 | 2,072 | 88.4% | 0.7% |
| Period 13 of 2025-26 | 1,902 | 87.4% | 1.3% |
| Period 12 of 2025-26 | 1,779 | 88.0% | 0.6% |
| Period 11 of 2025-26 | 1,771 | 85.2% | 0.7% |
| Period 10 of 2025-26 | 1,661 | 83.4% | 0.8% |
| Period 9 of 2025-26 | 1,727 | 83.2% | 2.2% |
| Period 8 of 2025-26 | 1,838 | 84.0% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pangbourne | 23,489 | 81.0% | 2.4% |
| Claygate | 23,622 | 84.8% | 3.0% |
| Cobham and Stoke D'abernon | 23,622 | 85.6% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out