Banbury
BANSouth EastManaged by Chiltern Railways
How this station is performing
Banbury had 49,158 scheduled stops to Period 7 of 2026-27, about 135 a day. 70.5% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Banbury opened on 2 September 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Banbury is the oldest; the next oldest, Heyford, dates from 1850.
The nearest stations to Banbury are Kings Sutton (5.5 km south-east), Heyford (15.9 km south), Tackley (20.1 km south), Bicester North (21.3 km south-east) and Bicester Village (22.4 km south-east). 1 stations lie within 10 km in all. At 70.5%, Banbury is less punctual than all of them; the best of the five, Bicester Village, manages 92.6%.
Banbury takes its name from a market town called Banbury, home to about 46,853 people, and the station stands 0.8 km from its centre.
3 operators call at Banbury: Chiltern Railways (80.0%, 51% of stops), CrossCountry (53.1%, 33% of stops) and Great Western Railway (74.6%, 16% of stops). The operator you travel with matters: Chiltern Railways reaches 80.0% within three minutes while CrossCountry manages 53.1%, a gap of 26.9 percentage points.
Compared with 3 stations of a similar size in South East, Banbury is the least punctual, at 70.5%. All of them are ahead, including Ebbsfleet International (81.2%), Crawley (71.7%) and Southwick (81.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 25,050 | 80.0% | 0.9% |
| CrossCountry | 16,302 | 53.1% | 5.0% |
| Great Western Railway | 7,806 | 74.6% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Banbury? Delay Repay
These operators call at Banbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,791 | 67.0% | 2.6% |
| Period 6 of 2026-27 | 3,809 | 60.6% | 3.4% |
| Period 5 of 2026-27 | 3,766 | 58.2% | 3.3% |
| Period 4 of 2026-27 | 3,788 | 60.2% | 2.9% |
| Period 3 of 2026-27 | 3,663 | 68.6% | 2.8% |
| Period 2 of 2026-27 | 3,763 | 72.4% | 3.1% |
| Period 1 of 2026-27 | 4,377 | 78.2% | 1.4% |
| Period 13 of 2025-26 | 4,143 | 79.4% | 1.7% |
| Period 12 of 2025-26 | 3,661 | 80.8% | 2.6% |
| Period 11 of 2025-26 | 3,760 | 76.6% | 2.1% |
| Period 10 of 2025-26 | 3,402 | 74.6% | 3.2% |
| Period 9 of 2025-26 | 3,586 | 66.9% | 2.7% |
| Period 8 of 2025-26 | 3,649 | 70.5% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ebbsfleet International | 48,894 | 81.2% | 1.7% |
| Crawley | 48,657 | 71.7% | 4.5% |
| Southwick | 48,345 | 81.4% | 4.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out