How this station is performing
Stonegate has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,805 scheduled stops, about 46 a day. In those periods 70.9% of stops arrived within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Stonegate opened on 1 September 1851, 175 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stonegate is the oldest; the next oldest, Etchingham, dates from 1851.
The nearest stations to Stonegate are Etchingham (5.6 km east), Wadhurst (6.9 km north-west), Robertsbridge (8.3 km south-east), Frant (10.6 km north-west) and Crowborough (12.6 km west). 3 stations lie within 10 km in all. At 70.9%, Stonegate is less punctual than all of them; the best of the five, Robertsbridge, manages 77.3%.
Stonegate takes its name from a Village called Stonegate, and the station stands 1.5 km from its centre.
Across the whole run of data, the weakest four-week period for Stonegate was Period 9 of 2024-25, at 51.0%, some time before the latest year. The strongest was Period 5 of 2024-25, at 80.3%, and the two are 29.3 percentage points apart. Cancellations peaked at 7.0% of scheduled stops in Period 10 of 2023-24, against 1.8% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Stonegate on 70.9%. The comparison group includes Newington (69.0%), Selling (73.1%) and Teynham (67.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,805 | 70.9% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Stonegate? Delay Repay
These operators call at Stonegate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,294 | 53.7% | 2.2% |
| Period 6 of 2026-27 | 1,279 | – | 2.0% |
| Period 5 of 2026-27 | 1,332 | 69.3% | 1.9% |
| Period 4 of 2026-27 | 1,290 | 73.6% | 0.3% |
| Period 3 of 2026-27 | 1,255 | 71.7% | 2.4% |
| Period 2 of 2026-27 | 1,310 | 74.1% | 2.7% |
| Period 1 of 2026-27 | 1,465 | 79.4% | 0.8% |
| Period 13 of 2025-26 | 1,518 | 75.5% | 0.6% |
| Period 12 of 2025-26 | 1,328 | 76.9% | 1.1% |
| Period 11 of 2025-26 | 1,262 | 76.3% | 2.5% |
| Period 10 of 2025-26 | 1,182 | 68.3% | 3.1% |
| Period 9 of 2025-26 | 1,297 | 62.7% | 2.6% |
| Period 8 of 2025-26 | 993 | 65.9% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East