Lewisham
LEWLondonManaged by Southeastern
How this station is performing
Lewisham had 168,171 scheduled stops to Period 7 of 2026-27, about 462 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Lewisham opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenwich is the oldest (1838) and St Johns (London) the newest (1873), with Lewisham in between.
The nearest stations to Lewisham are St Johns (London) (0.7 km north-west), Ladywell (1.1 km south), Greenwich (1.4 km north), Blackheath (1.5 km east) and Brockley (1.6 km west). 124 stations lie within 10 km in all. Of the five, Ladywell is the most punctual at 93.0% and Greenwich the least at 86.6%, with Lewisham on 87.0%.
Lewisham takes its name from an area of London called Lewisham, home to about 60,573 people, and the station stands 0.8 km from its centre.
2 operators call at Lewisham: Southeastern (87.0%, 100% of stops) and GTR (90.9%, 0% of stops). They are close together, with GTR leading on 90.9% and Southeastern trailing on 87.0%, a gap of 3.9 percentage points.
2 of 3 stations of a similar size in London are more punctual than Lewisham on 87.0%. The comparison group includes Romford (90.3%), Willesden Junction (86.2%) and Barking (92.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 167,784 | 87.0% | 1.5% |
| GTR | 387 | 90.9% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Lewisham? Delay Repay
These operators call at Lewisham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,919 | 85.7% | 1.0% |
| Period 6 of 2026-27 | 12,800 | 85.2% | 0.8% |
| Period 5 of 2026-27 | 13,571 | 88.1% | 2.2% |
| Period 4 of 2026-27 | 12,947 | 88.1% | 1.4% |
| Period 3 of 2026-27 | 13,240 | 84.7% | 2.7% |
| Period 2 of 2026-27 | 12,415 | 85.6% | 3.3% |
| Period 1 of 2026-27 | 14,981 | 89.3% | 0.9% |
| Period 13 of 2025-26 | 13,228 | 89.0% | 2.0% |
| Period 12 of 2025-26 | 13,567 | 87.3% | 1.3% |
| Period 11 of 2025-26 | 12,307 | 88.2% | 0.9% |
| Period 10 of 2025-26 | 10,764 | 88.5% | 1.3% |
| Period 9 of 2025-26 | 13,320 | 85.7% | 0.9% |
| Period 8 of 2025-26 | 13,112 | 85.3% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Romford | 161,709 | 90.3% | 1.9% |
| Willesden Junction | 160,851 | 86.2% | 6.4% |
| Barking | 156,374 | 92.4% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out