Orpington
ORPLondonManaged by Southeastern
How this station is performing
Orpington had 133,035 scheduled stops to Period 7 of 2026-27, about 366 a day. 80.2% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Orpington opened on 2 March 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, St Mary Cray is the oldest (1860) and Petts Wood the newest (1928), with Orpington in between.
The nearest stations to Orpington are Petts Wood (2.0 km north-west), Chelsfield (2.3 km south-east), St Mary Cray (2.6 km north-east), Chislehurst (4.2 km north-west) and Knockholt (4.2 km south-east). 32 stations lie within 10 km in all. At 80.2%, Orpington is less punctual than all of them; the best of the five, Chislehurst, manages 91.0%.
Orpington takes its name from an area of London called Orpington, home to about 90,315 people, and the station stands 0.7 km from its centre.
2 operators call at Orpington: Southeastern (80.1%, 94% of stops) and GTR (81.0%, 6% of stops). They are close together, with GTR leading on 81.0% and Southeastern trailing on 80.1%, a gap of 0.9 percentage points.
Compared with 3 stations of a similar size in London, Orpington is the least punctual, at 80.2%. All of them are ahead, including Ealing Broadway (82.9%), Hackney Downs (92.3%) and Heathrow Terminals 2 and 3 (Rail Station Only) (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 125,300 | 80.1% | 1.7% |
| GTR | 7,735 | 81.0% | 5.9% |
Operators with their own page for this station are linked to it.
Late train at Orpington? Delay Repay
These operators call at Orpington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,336 | 76.3% | 1.5% |
| Period 6 of 2026-27 | 10,388 | 73.1% | 2.1% |
| Period 5 of 2026-27 | 9,407 | 77.3% | 2.5% |
| Period 4 of 2026-27 | 10,183 | 81.4% | 1.6% |
| Period 3 of 2026-27 | 10,369 | 80.1% | 2.9% |
| Period 2 of 2026-27 | 9,912 | 84.1% | 2.6% |
| Period 1 of 2026-27 | 11,767 | 86.7% | 1.3% |
| Period 13 of 2025-26 | 11,283 | 84.5% | 1.7% |
| Period 12 of 2025-26 | 10,326 | 83.2% | 1.2% |
| Period 11 of 2025-26 | 10,176 | 82.1% | 1.4% |
| Period 10 of 2025-26 | 8,286 | 78.5% | 3.0% |
| Period 9 of 2025-26 | 10,312 | 76.2% | 2.1% |
| Period 8 of 2025-26 | 10,290 | 76.8% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ealing Broadway | 133,358 | 82.9% | 4.3% |
| Hackney Downs | 133,822 | 92.3% | 2.1% |
| Heathrow Terminals 2 and 3 (Rail Station Only) | 131,842 | 87.9% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out