London Charing Cross
CHXLondonManaged by Network Rail
How this station is performing
London Charing Cross had 201,825 scheduled stops to Period 7 of 2026-27, about 554 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
London Charing Cross opened on 11 January 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Waterloo is the oldest (1848) and Tottenham Court Road the newest (2022), with London Charing Cross in between.
The nearest stations to London Charing Cross are London Waterloo (0.9 km south-east), Tottenham Court Road (1.1 km north-west), London Waterloo East (1.1 km east), London Blackfriars (1.4 km east) and City Thameslink (1.6 km north-east). 131 stations lie within 10 km in all. Of the five, Tottenham Court Road is the most punctual at 92.1% and City Thameslink the least at 77.2%, with London Charing Cross on 84.9%.
London Charing Cross is named after Charing Cross, an area of London, but the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in London are more punctual than London Charing Cross on 84.9%. The comparison group includes London Waterloo East (85.8%), Wimbledon (82.8%) and London Blackfriars (80.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 201,825 | 84.9% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at London Charing Cross? Delay Repay
These operators call at London Charing Cross and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,969 | 80.3% | 2.1% |
| Period 6 of 2026-27 | 16,345 | 77.9% | 3.2% |
| Period 5 of 2026-27 | 3,944 | 76.5% | 5.3% |
| Period 4 of 2026-27 | 16,144 | 86.1% | 2.0% |
| Period 3 of 2026-27 | 16,503 | 85.0% | 4.2% |
| Period 2 of 2026-27 | 16,221 | 86.7% | 2.4% |
| Period 1 of 2026-27 | 18,933 | 89.0% | 2.1% |
| Period 13 of 2025-26 | 18,742 | 89.4% | 2.2% |
| Period 12 of 2025-26 | 16,479 | 87.6% | 1.5% |
| Period 11 of 2025-26 | 16,172 | 85.0% | 2.0% |
| Period 10 of 2025-26 | 13,493 | 84.6% | 2.7% |
| Period 9 of 2025-26 | 16,778 | 81.7% | 2.1% |
| Period 8 of 2025-26 | 16,102 | 85.7% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Waterloo East | 201,786 | 85.8% | 2.4% |
| Wimbledon | 204,294 | 82.8% | 5.4% |
| London Blackfriars | 204,825 | 80.5% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out