London Waterloo East
WAELondonManaged by Southeastern
How this station is performing
London Waterloo East had 201,786 scheduled stops to Period 7 of 2026-27, about 554 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
London Waterloo East opened on 1 January 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Waterloo is the oldest (1848) and City Thameslink the newest (1990), with London Waterloo East in between.
The nearest stations to London Waterloo East are London Waterloo (0.4 km south-west), London Blackfriars (0.8 km north-east), London Charing Cross (1.1 km west), City Thameslink (1.2 km north) and Elephant and Castle (1.3 km south-east). 134 stations lie within 10 km in all. At 85.8%, London Waterloo East is more punctual than every one of them; the best of the five, Elephant and Castle, manages 85.6%.
London Waterloo East is named after Waterloo, an area of London, but the station stands 0.4 km from its centre.
Compared with 3 stations of a similar size in London, London Waterloo East is the most punctual, at 85.8%. The comparison group includes London Charing Cross (84.9%), Wimbledon (82.8%) and London Blackfriars (80.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 201,786 | 85.8% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at London Waterloo East? Delay Repay
These operators call at London Waterloo East and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,967 | 81.0% | 2.1% |
| Period 6 of 2026-27 | 16,338 | 79.0% | 3.2% |
| Period 5 of 2026-27 | 3,945 | 77.9% | 5.3% |
| Period 4 of 2026-27 | 16,145 | 86.7% | 2.0% |
| Period 3 of 2026-27 | 16,496 | 86.5% | 4.2% |
| Period 2 of 2026-27 | 16,216 | 87.6% | 2.4% |
| Period 1 of 2026-27 | 18,929 | 90.0% | 2.1% |
| Period 13 of 2025-26 | 18,749 | 90.0% | 2.2% |
| Period 12 of 2025-26 | 16,477 | 88.6% | 1.5% |
| Period 11 of 2025-26 | 16,183 | 86.1% | 2.0% |
| Period 10 of 2025-26 | 13,461 | 85.7% | 2.8% |
| Period 9 of 2025-26 | 16,778 | 82.4% | 2.1% |
| Period 8 of 2025-26 | 16,102 | 86.4% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Charing Cross | 201,825 | 84.9% | 2.4% |
| Wimbledon | 204,294 | 82.8% | 5.4% |
| London Blackfriars | 204,825 | 80.5% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out