London Victoria
VICLondonManaged by Network Rail
How this station is performing
London Victoria had 385,288 scheduled stops to Period 7 of 2026-27, about 1058 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
London Victoria opened on 1 October 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Vauxhall is the oldest (1838) and Bond Street the newest (2022), with London Victoria in between.
The nearest stations to London Victoria are Vauxhall (1.8 km south-east), Battersea Park (1.9 km south), London Charing Cross (2.0 km north-east), Bond Street (2.1 km north) and Queenstown Road (Battersea) (2.2 km south). 134 stations lie within 10 km in all. At 82.7%, London Victoria is less punctual than all of them; the best of the five, Battersea Park, manages 94.1%.
London Victoria is named after London, a city, home to about 8,799,728 people, but the station stands 1.8 km from its centre.
2 operators call at London Victoria: GTR (83.0%, 65% of stops) and Southeastern (82.1%, 35% of stops). They are close together, with GTR leading on 83.0% and Southeastern trailing on 82.1%, a gap of 0.9 percentage points.
Compared with 3 stations of a similar size in London, London Victoria is the least punctual, at 82.7%. All of them are ahead, including Stratford (London) (89.0%), Farringdon (86.9%) and London Paddington (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 251,969 | 83.0% | 3.1% |
| Southeastern | 133,319 | 82.1% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at London Victoria? Delay Repay
These operators call at London Victoria and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 29,509 | 79.9% | 3.7% |
| Period 6 of 2026-27 | 28,614 | 77.1% | 2.4% |
| Period 5 of 2026-27 | 30,495 | 76.2% | 3.4% |
| Period 4 of 2026-27 | 29,640 | 82.7% | 2.4% |
| Period 3 of 2026-27 | 29,745 | 82.8% | 2.6% |
| Period 2 of 2026-27 | 29,585 | 85.5% | 2.7% |
| Period 1 of 2026-27 | 32,837 | 89.8% | 1.3% |
| Period 13 of 2025-26 | 32,374 | 88.5% | 2.2% |
| Period 12 of 2025-26 | 29,208 | 85.9% | 1.7% |
| Period 11 of 2025-26 | 29,172 | 85.2% | 1.6% |
| Period 10 of 2025-26 | 25,504 | 80.6% | 2.2% |
| Period 9 of 2025-26 | 29,332 | 78.6% | 2.3% |
| Period 8 of 2025-26 | 29,273 | 80.3% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stratford (London) | 389,909 | 89.0% | 4.3% |
| Farringdon | 400,839 | 86.9% | 4.0% |
| London Paddington | 420,545 | 84.2% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out