Maidstone Barracks
MDBSouth EastManaged by Southeastern
How this station is performing
Maidstone Barracks had 23,767 scheduled stops to Period 7 of 2026-27, about 65 a day. 95.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Maidstone Barracks opened on 1 July 1874, 152 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Maidstone Barracks is the newest; the oldest, Maidstone West, opened in 1844.
The nearest stations to Maidstone Barracks are Maidstone East (0.4 km east), Maidstone West (0.8 km south), Barming (2.6 km west), East Farleigh (3.2 km south-west) and Aylesford (4.3 km north-west). 14 stations lie within 10 km in all. At 95.2%, Maidstone Barracks is more punctual than every one of them; the best of the five, East Farleigh, manages 95.0%.
Maidstone Barracks is named after Maidstone, a county town, home to about 109,490 people, but the station stands 1.2 km from its centre.
In South East, Maidstone Barracks ranks 18th of 409 ranked stations. Its 95.2% is 14.0 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Maidstone Barracks is the most punctual, at 95.2%. The comparison group includes Aylesford (94.7%), Cuxton (94.1%) and Halling (95.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 23,767 | 95.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Maidstone Barracks? Delay Repay
These operators call at Maidstone Barracks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,868 | 95.6% | 1.1% |
| Period 6 of 2026-27 | 1,805 | 96.3% | 1.3% |
| Period 5 of 2026-27 | 1,775 | 95.8% | 2.8% |
| Period 4 of 2026-27 | 1,868 | 96.1% | 1.4% |
| Period 3 of 2026-27 | 1,808 | 93.4% | 1.9% |
| Period 2 of 2026-27 | 1,766 | 94.7% | 1.3% |
| Period 1 of 2026-27 | 2,111 | 97.6% | 0.8% |
| Period 13 of 2025-26 | 1,954 | 96.1% | 2.0% |
| Period 12 of 2025-26 | 1,808 | 95.5% | 0.6% |
| Period 11 of 2025-26 | 1,836 | 95.7% | 1.2% |
| Period 10 of 2025-26 | 1,560 | 94.7% | 1.2% |
| Period 9 of 2025-26 | 1,740 | 91.3% | 4.1% |
| Period 8 of 2025-26 | 1,868 | 93.9% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out