Wateringbury
WTRSouth EastManaged by Southeastern
How this station is performing
Wateringbury had 22,703 scheduled stops to Period 7 of 2026-27, about 62 a day. 95.1% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Wateringbury opened on 25 September 1844, 182 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wateringbury is the oldest; the next oldest, Yalding, dates from 1844.
The nearest stations to Wateringbury are Yalding (2.7 km south), East Malling (4.2 km north), East Farleigh (4.4 km east), West Malling (4.7 km north) and Beltring (5.2 km south). 15 stations lie within 10 km in all. Of the five, Yalding is the most punctual at 95.3% and West Malling the least at 74.8%, with Wateringbury on 95.1%.
Wateringbury takes its name from a Village called Wateringbury, home to about 2,104 people, and the station stands 0.6 km from its centre.
In South East, Wateringbury ranks 20th of 409 ranked stations. Its 95.1% is 13.9 percentage points better than the area median of 81.2%.
1 of 3 stations of a similar size in South East are more punctual than Wateringbury on 95.1%. The comparison group includes Beltring (94.7%), East Farleigh (95.0%) and Yalding (95.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 22,703 | 95.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Wateringbury? Delay Repay
These operators call at Wateringbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,780 | 94.9% | 1.2% |
| Period 6 of 2026-27 | 1,683 | 95.9% | 1.5% |
| Period 5 of 2026-27 | 1,686 | 95.7% | 2.8% |
| Period 4 of 2026-27 | 1,780 | 96.5% | 1.6% |
| Period 3 of 2026-27 | 1,720 | 92.0% | 2.0% |
| Period 2 of 2026-27 | 1,716 | 94.9% | 1.3% |
| Period 1 of 2026-27 | 2,013 | 97.3% | 0.7% |
| Period 13 of 2025-26 | 1,892 | 96.5% | 2.9% |
| Period 12 of 2025-26 | 1,720 | 95.5% | 0.6% |
| Period 11 of 2025-26 | 1,747 | 96.2% | 1.3% |
| Period 10 of 2025-26 | 1,499 | 94.7% | 1.3% |
| Period 9 of 2025-26 | 1,687 | 91.2% | 3.8% |
| Period 8 of 2025-26 | 1,780 | 93.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Beltring | 22,703 | 94.7% | 1.8% |
| East Farleigh | 22,703 | 95.0% | 1.8% |
| Yalding | 22,703 | 95.3% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out