New Hythe
NHESouth EastManaged by Southeastern
How this station is performing
New Hythe had 23,766 scheduled stops to Period 7 of 2026-27, about 65 a day. 95.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
New Hythe opened on 9 December 1929, 97 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, New Hythe is the newest; the oldest, Aylesford, opened in 1856.
The nearest stations to New Hythe are Aylesford (1.4 km south-east), Snodland (2.1 km north), East Malling (3.1 km south), West Malling (3.4 km south-west) and Barming (3.5 km south-east). 18 stations lie within 10 km in all. At 95.2%, New Hythe is more punctual than every one of them; the best of the five, Aylesford, manages 94.7%.
New Hythe takes its name from a Village called New Hythe, and the station stands 0.6 km from its centre.
In South East, New Hythe ranks 19th of 409 ranked stations. Its 95.2% is 14.0 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, New Hythe is the most punctual, at 95.2%. The comparison group includes Halling (95.0%), Aylesford (94.7%) and Cuxton (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 23,766 | 95.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at New Hythe? Delay Repay
These operators call at New Hythe and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,868 | 95.3% | 1.1% |
| Period 6 of 2026-27 | 1,805 | 96.0% | 1.3% |
| Period 5 of 2026-27 | 1,774 | 95.6% | 2.8% |
| Period 4 of 2026-27 | 1,868 | 96.3% | 1.3% |
| Period 3 of 2026-27 | 1,808 | 93.7% | 1.9% |
| Period 2 of 2026-27 | 1,766 | 95.0% | 1.3% |
| Period 1 of 2026-27 | 2,111 | 97.7% | 0.8% |
| Period 13 of 2025-26 | 1,954 | 96.2% | 2.1% |
| Period 12 of 2025-26 | 1,808 | 95.7% | 0.6% |
| Period 11 of 2025-26 | 1,836 | 95.9% | 1.2% |
| Period 10 of 2025-26 | 1,560 | 94.6% | 1.2% |
| Period 9 of 2025-26 | 1,740 | 91.2% | 4.1% |
| Period 8 of 2025-26 | 1,868 | 93.6% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out