Bromley North
BMNLondonManaged by Southeastern
How this station is performing
Bromley North had 25,313 scheduled stops to Period 7 of 2026-27, about 70 a day. 99.2% of recorded arrivals were within three minutes of the timetable and 0.5% of scheduled stops were cancelled.
Bromley North opened on 1 January 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bromley South is the oldest (1858) and Elmstead Woods the newest (1904), with Bromley North in between.
The nearest stations to Bromley North are Sundridge Park (0.6 km north-east), Bromley South (1.0 km south), Shortlands (1.1 km west), Ravensbourne (1.8 km west) and Elmstead Woods (2.1 km north-east). 79 stations lie within 10 km in all. Of the five, Sundridge Park is the most punctual at 99.4% and Bromley South the least at 82.4%, with Bromley North on 99.2%.
Bromley North is named after Bromley, an area of London, home to about 87,889 people, but the station stands 0.3 km from its centre.
Bromley North is among the most punctual stations in Britain. Its 99.2% puts it 3rd out of 2,374 ranked stations, with 2 ahead of it and 2,371 behind, and 15.3 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in London are more punctual than Bromley North on 99.2%. The comparison group includes Sundridge Park (99.4%), Southbury (93.4%) and Turkey Street (92.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 25,313 | 99.2% | 0.5% |
Operators with their own page for this station are linked to it.
Late train at Bromley North? Delay Repay
These operators call at Bromley North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,809 | 98.9% | 0.4% |
| Period 6 of 2026-27 | 1,965 | 98.9% | 0.0% |
| Period 5 of 2026-27 | 1,972 | 99.4% | 0.4% |
| Period 4 of 2026-27 | 1,988 | 99.8% | 0.8% |
| Period 3 of 2026-27 | 1,976 | 99.4% | 0.8% |
| Period 2 of 2026-27 | 1,796 | 99.3% | 0.4% |
| Period 1 of 2026-27 | 2,229 | 99.3% | 0.4% |
| Period 13 of 2025-26 | 2,138 | 99.4% | 1.0% |
| Period 12 of 2025-26 | 1,972 | 99.3% | 0.0% |
| Period 11 of 2025-26 | 1,982 | 99.2% | 0.0% |
| Period 10 of 2025-26 | 1,526 | 99.6% | 0.0% |
| Period 9 of 2025-26 | 1,972 | 98.3% | 1.4% |
| Period 8 of 2025-26 | 1,988 | 99.2% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sundridge Park | 25,245 | 99.4% | 0.5% |
| Southbury | 25,472 | 93.4% | 1.9% |
| Turkey Street | 25,612 | 92.9% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out