Woking
WOKSouth EastManaged by South Western Railway
How this station is performing
Woking had 158,414 scheduled stops to Period 7 of 2026-27, about 435 a day. 73.7% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Woking opened on 21 May 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Woking is the oldest; the next oldest, Brookwood, dates from 1864.
The nearest stations to Woking are Worplesdon (3.8 km south-west), West Byfleet (4.3 km north-east), Brookwood (5.7 km west), Byfleet and New Haw (6.4 km north-east) and Clandon (7.2 km south-east). 14 stations lie within 10 km in all. At 73.7%, Woking is less punctual than all of them; the best of the five, Brookwood, manages 86.8%.
Woking is one of 2 stations named after a town called Woking, home to about 62,796 people; this one stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Woking was Period 9 of 2024-25, at 59.2%, some time before the latest year. The strongest was Period 5 of 2023-24, at 88.5%, and the two are 29.3 percentage points apart. Cancellations peaked at 6.6% of scheduled stops in Period 9 of 2023-24, against 2.7% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Woking is the least punctual, at 73.7%. All of them are ahead, including Dartford (82.4%), Brighton (82.3%) and Guildford (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 158,414 | 73.7% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Woking? Delay Repay
These operators call at Woking and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,925 | 69.9% | 2.7% |
| Period 6 of 2026-27 | 12,415 | 75.6% | 1.3% |
| Period 5 of 2026-27 | 12,465 | 70.8% | 3.6% |
| Period 4 of 2026-27 | 12,169 | 73.9% | 3.3% |
| Period 3 of 2026-27 | 11,707 | 75.5% | 2.9% |
| Period 2 of 2026-27 | 12,020 | 69.4% | 6.4% |
| Period 1 of 2026-27 | 13,859 | 80.8% | 2.3% |
| Period 13 of 2025-26 | 12,666 | 82.9% | 1.4% |
| Period 12 of 2025-26 | 12,377 | 79.5% | 2.7% |
| Period 11 of 2025-26 | 12,123 | 77.4% | 1.7% |
| Period 10 of 2025-26 | 10,807 | 70.7% | 2.7% |
| Period 9 of 2025-26 | 11,382 | 62.8% | 2.1% |
| Period 8 of 2025-26 | 12,499 | 66.1% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out