Ryde St Johns Road
RYRSouth EastManaged by South Western Railway (Island Line)
How this station is performing
Ryde St Johns Road had 18,038 scheduled stops to Period 7 of 2026-27, about 50 a day. 98.7% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Ryde St Johns Road opened on 23 August 1864, 162 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ryde St Johns Road is the oldest; the next oldest, Brading, dates from 1864.
The nearest stations to Ryde St Johns Road are Ryde Esplanade (1.0 km north), Smallbrook Junction (1.4 km south), Ryde Pier Head (1.7 km north), Brading (5.2 km south) and Sandown (7.5 km south). 9 stations lie within 10 km in all. At 98.7%, Ryde St Johns Road is more punctual than every one of them; the best of the five, Brading, manages 98.7%.
Ryde St Johns Road is named after Ryde, a town, home to about 24,100 people, but the station stands 0.5 km from its centre.
Compared with 3 stations of a similar size in South East, Ryde St Johns Road is the most punctual, at 98.7%. The comparison group includes Aldrington (83.7%), Barming (80.9%) and East Malling (82.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 18,038 | 98.7% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Ryde St Johns Road? Delay Repay
These operators call at Ryde St Johns Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,386 | 98.9% | 0.4% |
| Period 6 of 2026-27 | 1,400 | 97.3% | 1.8% |
| Period 5 of 2026-27 | 1,428 | 98.2% | 1.1% |
| Period 4 of 2026-27 | 1,433 | 98.6% | 0.5% |
| Period 3 of 2026-27 | 1,432 | 99.3% | 0.4% |
| Period 2 of 2026-27 | 1,432 | 98.7% | 2.0% |
| Period 1 of 2026-27 | 1,640 | 99.2% | 1.3% |
| Period 13 of 2025-26 | 1,582 | 99.0% | 2.2% |
| Period 12 of 2025-26 | 1,382 | 98.4% | 9.3% |
| Period 11 of 2025-26 | 1,430 | 99.2% | 6.2% |
| Period 10 of 2025-26 | 1,317 | 98.4% | 6.5% |
| Period 9 of 2025-26 | 1,474 | 99.1% | 1.0% |
| Period 8 of 2025-26 | 702 | 98.6% | 0.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aldrington | 17,939 | 83.7% | 2.4% |
| Barming | 17,939 | 80.9% | 1.2% |
| East Malling | 17,939 | 82.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out