How this station is performing
Templecombe had 14,293 scheduled stops to Period 7 of 2026-27, about 39 a day. 64.5% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Templecombe opened on 7 May 1860 and closed to passengers on 7 March 1966. It reopened on 5 September 1982, 44 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Templecombe is the newest; the oldest, Bruton, opened in 1856.
The nearest stations to Templecombe are Sherborne (9.3 km south-west), Gillingham (Dorset) (10.8 km east), Bruton (12.4 km north), Castle Cary (13.2 km north-west) and Yeovil Pen Mill (15.1 km south-west). 1 stations lie within 10 km in all. Of the five, Yeovil Pen Mill is the most punctual at 70.8% and Castle Cary the least at 57.2%, with Templecombe on 64.5%.
Templecombe takes its name from a Village called Templecombe, home to about 1,657 people, and the station stands 0.2 km from its centre.
Templecombe has slipped sharply. 64.5% of stops came within three minutes of the timetable in the latest 13 periods, 5.2 percentage points worse than the 69.7% recorded in the 13 before. Cancellations rose to 2.5% of scheduled stops from 1.6%, which is 0.9 percentage points more.
Compared with 3 stations of a similar size in South West, Templecombe is the least punctual, at 64.5%. All of them are ahead, including Sherborne (69.1%), Severn Beach (79.1%) and Tisbury (65.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 14,293 | 64.5% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Templecombe? Delay Repay
These operators call at Templecombe and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,026 | 55.3% | 2.5% |
| Period 6 of 2026-27 | 1,049 | 59.1% | 1.5% |
| Period 5 of 2026-27 | 1,094 | 43.6% | 4.8% |
| Period 4 of 2026-27 | 1,089 | 46.9% | 2.6% |
| Period 3 of 2026-27 | 1,111 | 64.9% | 1.4% |
| Period 2 of 2026-27 | 1,125 | 57.8% | 2.7% |
| Period 1 of 2026-27 | 1,306 | 64.5% | 1.5% |
| Period 13 of 2025-26 | 1,267 | 73.0% | 2.1% |
| Period 12 of 2025-26 | 1,144 | 80.7% | 1.7% |
| Period 11 of 2025-26 | 1,061 | 59.5% | 3.1% |
| Period 10 of 2025-26 | 1,019 | 66.3% | 1.9% |
| Period 9 of 2025-26 | 1,030 | 77.1% | 2.3% |
| Period 8 of 2025-26 | 972 | 91.3% | 5.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sherborne | 14,225 | 69.1% | 2.5% |
| Severn Beach | 14,546 | 79.1% | 4.0% |
| Tisbury | 14,551 | 65.6% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out