Clapham Junction
CLJLondonManaged by Network Rail
How this station is performing
Clapham Junction had 715,431 scheduled stops to Period 7 of 2026-27, about 1966 a day. 84.3% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Clapham Junction opened on 2 March 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wandsworth Town is the oldest (1846) and Imperial Wharf the newest (2009), with Clapham Junction in between.
The nearest stations to Clapham Junction are Wandsworth Town (1.3 km west), Imperial Wharf (1.5 km north-west), Wandsworth Common (2.1 km south), Queenstown Road (Battersea) (2.1 km north-east) and Battersea Park (2.2 km north-east). 119 stations lie within 10 km in all. At 84.3%, Clapham Junction is less punctual than all of them; the best of the five, Battersea Park, manages 94.1%.
Clapham Junction takes its name from an area of London called Clapham Junction, and the station stands 0.2 km from its centre.
3 operators call at Clapham Junction: South Western Railway (82.5%, 52% of stops), GTR (84.2%, 33% of stops) and London Overground (91.0%, 15% of stops). The operator you travel with matters: London Overground reaches 91.0% within three minutes while South Western Railway manages 82.5%, a gap of 8.5 percentage points.
2 of 3 stations of a similar size in London are more punctual than Clapham Junction on 84.3%. The comparison group includes London Bridge (83.2%), London Liverpool Street (91.4%) and Whitechapel (91.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 372,346 | 82.5% | 4.3% |
| GTR | 238,078 | 84.2% | 2.8% |
| London Overground | 105,007 | 91.0% | 8.2% |
Operators with their own page for this station are linked to it.
Late train at Clapham Junction? Delay Repay
These operators call at Clapham Junction and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 55,232 | 84.0% | 4.6% |
| Period 6 of 2026-27 | 54,054 | 83.3% | 3.8% |
| Period 5 of 2026-27 | 55,101 | 83.7% | 5.9% |
| Period 4 of 2026-27 | 56,114 | 85.1% | 4.4% |
| Period 3 of 2026-27 | 53,431 | 85.1% | 5.1% |
| Period 2 of 2026-27 | 54,267 | 83.4% | 7.3% |
| Period 1 of 2026-27 | 62,580 | 88.2% | 3.4% |
| Period 13 of 2025-26 | 58,942 | 88.8% | 2.6% |
| Period 12 of 2025-26 | 54,814 | 86.0% | 4.1% |
| Period 11 of 2025-26 | 54,268 | 85.7% | 3.0% |
| Period 10 of 2025-26 | 47,749 | 82.5% | 3.7% |
| Period 9 of 2025-26 | 54,491 | 78.4% | 4.0% |
| Period 8 of 2025-26 | 54,388 | 80.4% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Bridge | 583,375 | 83.2% | 2.6% |
| London Liverpool Street | 571,113 | 91.4% | 2.2% |
| Whitechapel | 436,497 | 91.0% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out