Earlsfield
EADLondonManaged by South Western Railway
How this station is performing
Earlsfield had 152,922 scheduled stops to Period 7 of 2026-27, about 420 a day. 81.2% of recorded arrivals were within three minutes of the timetable and 5.2% of scheduled stops were cancelled.
Earlsfield opened on 1 April 1884, 142 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Earlsfield is the newest; the oldest, Wimbledon, opened in 1838.
The nearest stations to Earlsfield are Wandsworth Common (1.7 km east), Haydons Road (1.9 km south), Wandsworth Town (2.0 km north), Balham (2.5 km east) and Wimbledon (2.6 km south-west). 101 stations lie within 10 km in all. At 81.2%, Earlsfield is less punctual than all of them; the best of the five, Balham, manages 93.2%.
Earlsfield takes its name from an area of London called Earlsfield, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Earlsfield was Period 9 of 2024-25, at 59.4%, some time before the latest year. The strongest was Period 5 of 2023-24, at 94.9%, and the two are 35.5 percentage points apart.
2 of 3 stations of a similar size in London are more punctual than Earlsfield on 81.2%. The comparison group includes Gospel Oak (85.8%), Peckham Rye (89.5%) and City Thameslink (77.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 152,922 | 81.2% | 5.2% |
Operators with their own page for this station are linked to it.
Late train at Earlsfield? Delay Repay
These operators call at Earlsfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,847 | 86.5% | 4.2% |
| Period 6 of 2026-27 | 11,748 | 86.4% | 3.9% |
| Period 5 of 2026-27 | 12,132 | 85.3% | 4.8% |
| Period 4 of 2026-27 | 12,119 | 85.3% | 3.4% |
| Period 3 of 2026-27 | 10,704 | 83.6% | 6.9% |
| Period 2 of 2026-27 | 11,914 | 78.4% | 9.7% |
| Period 1 of 2026-27 | 13,901 | 85.3% | 3.7% |
| Period 13 of 2025-26 | 11,895 | 85.8% | 2.9% |
| Period 12 of 2025-26 | 11,804 | 78.3% | 6.8% |
| Period 11 of 2025-26 | 11,603 | 80.0% | 3.3% |
| Period 10 of 2025-26 | 9,482 | 77.4% | 6.0% |
| Period 9 of 2025-26 | 11,638 | 68.4% | 4.8% |
| Period 8 of 2025-26 | 12,135 | 73.2% | 7.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gospel Oak | 152,525 | 85.8% | 6.5% |
| Peckham Rye | 153,734 | 89.5% | 3.5% |
| City Thameslink | 151,068 | 77.2% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out