Hyndland
HYNScotlandManaged by ScotRail
How this station is performing
Hyndland had 143,336 scheduled stops to Period 7 of 2026-27, about 394 a day. 82.7% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Hyndland opened on 5 November 1960, 66 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Maryhill is the oldest (1858) and Kelvindale the newest (2005), with Hyndland in between.
The nearest stations to Hyndland are Jordanhill (0.7 km north-west), Partick (1.1 km south), Anniesland (1.2 km north), Kelvindale (1.5 km north) and Maryhill (2.1 km north-east). 75 stations lie within 10 km in all. At 82.7%, Hyndland is less punctual than all of them; the best of the five, Kelvindale, manages 95.6%.
The time of year matters a great deal for Hyndland. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 76.7%, while period 4 (July) is the strongest at 88.6%, a spread of 11.9 percentage points.
Compared with 3 stations of a similar size in Scotland, Hyndland is the least punctual, at 82.7%. All of them are ahead, including Partick (83.0%), Dalmuir (85.2%) and Glasgow Queen Street (86.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 143,336 | 82.7% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Hyndland? Delay Repay
These operators call at Hyndland and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,920 | 77.6% | 2.3% |
| Period 6 of 2026-27 | 10,920 | 83.9% | 1.2% |
| Period 5 of 2026-27 | 10,933 | 83.2% | 1.5% |
| Period 4 of 2026-27 | 10,879 | 84.9% | 3.6% |
| Period 3 of 2026-27 | 10,929 | 85.1% | 1.2% |
| Period 2 of 2026-27 | 10,908 | 83.2% | 1.1% |
| Period 1 of 2026-27 | 12,580 | 84.1% | 1.5% |
| Period 13 of 2025-26 | 11,928 | 84.2% | 1.3% |
| Period 12 of 2025-26 | 10,896 | 86.2% | 1.5% |
| Period 11 of 2025-26 | 10,896 | 85.4% | 1.6% |
| Period 10 of 2025-26 | 9,743 | 82.7% | 2.0% |
| Period 9 of 2025-26 | 10,908 | 76.8% | 3.7% |
| Period 8 of 2025-26 | 10,896 | 77.1% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Partick | 145,005 | 83.0% | 1.8% |
| Dalmuir | 114,407 | 85.2% | 1.9% |
| Glasgow Queen Street | 200,788 | 86.8% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out