Garelochhead
GCHScotlandManaged by ScotRail
How this station is performing
Garelochhead had 4,668 scheduled stops to Period 7 of 2026-27, about 13 a day. 58.6% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Garelochhead opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Garelochhead is the newest; the oldest, Helensburgh Central, opened in 1858.
The nearest stations to Garelochhead are Helensburgh Upper (9.6 km south-east), Helensburgh Central (10.3 km south-east), Craigendoran (11.8 km south-east), Gourock (13.2 km south) and Fort Matilda (13.6 km south). 1 stations lie within 10 km in all. Of the five, Fort Matilda is the most punctual at 93.9% and Helensburgh Upper the least at 58.2%, with Garelochhead on 58.6%.
Garelochhead takes its name from a Village called Garelochhead, home to about 3,700 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Garelochhead was Period 7 of 2023-24, at 42.9%, some time before the latest year. The strongest was Period 12 of 2025-26, at 70.1%, and the two are 27.2 percentage points apart. Cancellations peaked at 6.4% of scheduled stops in Period 11 of 2023-24, against 0.9% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Garelochhead on 58.6%. The comparison group includes Arrochar and Tarbet (55.6%), Helensburgh Upper (58.2%) and Ardlui (60.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 4,387 | 58.3% | 0.8% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Garelochhead? Delay Repay
These operators call at Garelochhead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 364 | 57.2% | 0.5% |
| Period 6 of 2026-27 | 366 | 63.0% | 1.4% |
| Period 5 of 2026-27 | 368 | 57.2% | 0.3% |
| Period 4 of 2026-27 | 366 | 53.3% | 0.8% |
| Period 3 of 2026-27 | 365 | 57.5% | 1.1% |
| Period 2 of 2026-27 | 368 | 56.3% | 0.0% |
| Period 1 of 2026-27 | 422 | 64.0% | 0.5% |
| Period 13 of 2025-26 | 402 | 64.2% | 1.0% |
| Period 12 of 2025-26 | 356 | 70.1% | 0.3% |
| Period 11 of 2025-26 | 346 | 52.7% | 2.3% |
| Period 10 of 2025-26 | 244 | 62.3% | 0.0% |
| Period 9 of 2025-26 | 344 | 49.9% | 2.0% |
| Period 8 of 2025-26 | 357 | 52.8% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Arrochar and Tarbet | 4,668 | 55.6% | 0.9% |
| Helensburgh Upper | 4,668 | 58.2% | 0.9% |
| Ardlui | 4,669 | 60.8% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out