ScotRail Delay Repay
What ScotRail pays back when a train is late, set beside how often its trains really are late.
The rules
| Arrival delay | Share of a single ticket |
|---|---|
| 30 to 59 minutes | 50% |
| 60 minutes or more | 100% |
Delay Repay and how often delays happen
ScotRail pays Delay Repay for a delay of 30 minutes or more at your destination.
Over the last 13 four-week periods to Period 7 of 2026-27, ScotRail had 9,542,892 scheduled stops. Of the stops with a recorded arrival, 87.9% came within three minutes of the timetable, so 12.1% did not, about 1 in 8.
The official measure treats any arrival more than three minutes behind as late, so for ScotRail the 12.1% is a ceiling on how often a delay of 30 minutes or more happens at a stop, not a count of claims.
A year ago, over the previous 13 periods, ScotRail managed 88.7% within three minutes. It now manages 87.9%, which is 0.8 percentage points worse, while cancellations moved from 2.0% to 1.6% of scheduled stops.
Among the stations where ScotRail runs trains, the oldest are Gartcosh (1831), Stepps (1831) and Broughty Ferry (1838), and the newest are Inverness Airport (2023), Edinburgh Gateway (2016) and Tweedbank (2015).
The northernmost stations in the ScotRail network are Thurso and Georgemas Junction, and the southernmost are Carlisle and Stranraer.
On the ScotRail network, the stations furthest from their nearest neighbour are Stranraer (26.0 km from Barrhill), Wick (22.1 km from Georgemas Junction) and Perth (20.2 km from Dunkeld and Birnam).
How punctuality has moved
Delay Repay across train companies
| Operator | Pays from | First band | Within 3 min | Cancelled |
|---|---|---|---|---|
| Greater Anglia | 15 min | 25% | 90.3% | 1.7% |
| Chiltern Railways | 15 min | 25% | 87.7% | 1.4% |
| Transport for Wales | 15 min | 25% | 85.0% | 3.0% |
| Southeastern | 15 min | 25% | 84.2% | 1.7% |
| GTR (Gatwick Express, Great Northern, Southern, Thameslink) | 15 min | 25% | 82.9% | 4.7% |
| South Western Railway | 15 min | 25% | 82.6% | 3.5% |
| West Midlands Railway | 15 min | 25% | 81.1% | 3.9% |
| Great Western Railway | 15 min | 25% | 75.7% | 4.0% |
| East Midlands Railway | 15 min | 25% | 74.6% | 3.7% |
| TransPennine Express | 15 min | 25% | 68.8% | 3.3% |
| Avanti | 15 min | 25% | 55.2% | 5.7% |
| Merseyrail | over 30 min | 100% | 91.5% | 2.0% |
| ScotRail | 30 min | 50% | 87.9% | 1.6% |
| Caledonian Sleeper | 30 min | – | 76.3% | 2.3% |
| Hull Trains | 30 min | 50% | 68.2% | 0.9% |
| LNER | 30 min | 50% | 67.6% | 2.9% |
| Lumo (East Coast) | 30 min | 50% | 66.7% | 3.0% |
| CrossCountry | 30 min | 50% | 63.2% | 5.9% |
| Lumo (West Coast) | 30 min | 50% | 60.0% | 5.1% |
| Grand Central | 60 min | 50% | 62.2% | 2.3% |
Where these rules come from
Rules checked on 2026-11-24 against the operator's own page, ScotRail: our delay repay guarantee.
https://www.scotrail.co.uk/plan-your-journey/our-delay-repay-guarantee
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out