Dalwhinnie
DLWScotlandManaged by ScotRail
How this station is performing
Dalwhinnie had 3,989 scheduled stops to Period 7 of 2026-27, about 11 a day. 53.3% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Dalwhinnie opened on 9 September 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dalwhinnie is the oldest; the next oldest, Newtonmore, dates from 1863.
Dalwhinnie is remote: its nearest neighbours are Newtonmore (15.8 km north-east), Kingussie (19.7 km north-east), Tulloch (28.2 km west), Blair Atholl (30.6 km south-east) and Corrour (33.3 km south-west). At 53.3%, Dalwhinnie is less punctual than all of them; the best of the five, Kingussie, manages 61.0%.
Dalwhinnie takes its name from a settlement called Dalwhinnie, and the station stands 0.3 km from its centre.
For Dalwhinnie, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 28.1% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 75.2%, which is 47.1 percentage points higher. Cancellations peaked at 6.9% of scheduled stops in Period 9 of 2024-25, against 1.4% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Dalwhinnie is the least punctual, at 53.3%. All of them are ahead, including Blair Atholl (54.5%), Fearn (82.8%) and Carrbridge (68.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 3,371 | 51.9% | 1.2% |
| Caledonian Sleeper | 618 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dalwhinnie? Delay Repay
These operators call at Dalwhinnie and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 308 | 38.9% | 1.9% |
| Period 6 of 2026-27 | 308 | 56.3% | 0.3% |
| Period 5 of 2026-27 | 308 | 54.0% | 4.9% |
| Period 4 of 2026-27 | 308 | 52.2% | 0.0% |
| Period 3 of 2026-27 | 305 | 61.1% | 0.3% |
| Period 2 of 2026-27 | 308 | 60.4% | 1.3% |
| Period 1 of 2026-27 | 354 | 65.7% | 2.5% |
| Period 13 of 2025-26 | 339 | 66.2% | 0.3% |
| Period 12 of 2025-26 | 308 | 60.0% | 0.3% |
| Period 11 of 2025-26 | 308 | 48.6% | 2.9% |
| Period 10 of 2025-26 | 259 | 48.6% | 0.4% |
| Period 9 of 2025-26 | 308 | 44.5% | 0.6% |
| Period 8 of 2025-26 | 268 | 28.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blair Atholl | 4,222 | 54.5% | 1.3% |
| Fearn | 4,298 | 82.8% | 2.7% |
| Carrbridge | 4,317 | 68.5% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out