Haymarket
HYMScotlandManaged by ScotRail
How this station is performing
Haymarket had 201,091 scheduled stops to Period 7 of 2026-27, about 552 a day. 85.0% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Haymarket opened on 21 February 1842 and closed to passengers on 1 November 1848. It reopened on 4 June 1856, 170 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Haymarket is the oldest; the next oldest, Edinburgh, dates from 1846.
The nearest stations to Haymarket are Edinburgh (2.0 km north-east), Slateford (2.5 km south-west), Kingsknowe (4.1 km south-west), South Gyle (5.1 km west) and Wester Hailes (5.3 km south-west). 12 stations lie within 10 km in all. Of the five, Slateford is the most punctual at 86.8% and Kingsknowe the least at 80.8%, with Haymarket on 85.0%.
Haymarket is one of 2 stations named after a settlement called Haymarket; this one stands 0.2 km from its centre.
6 operators call at Haymarket: ScotRail (86.7%, 92% of stops), TransPennine Express (71.8%, 3% of stops), Avanti (66.1%, 2% of stops), LNER (51.2%, 2% of stops) and CrossCountry (65.0%, 1% of stops). The operator you travel with matters: ScotRail reaches 86.7% within three minutes while LNER manages 51.2%, a gap of 35.5 percentage points.
1 of 3 stations of a similar size in Scotland are more punctual than Haymarket on 85.0%. The comparison group includes Glasgow Queen Street (86.8%), Edinburgh (84.8%) and Partick (83.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 184,685 | 86.7% | 1.4% |
| TransPennine Express | 5,216 | 71.8% | 3.7% |
| Avanti | 4,677 | 66.1% | 4.5% |
| LNER | 3,417 | 51.2% | 1.3% |
| CrossCountry | 2,409 | 65.0% | 11.4% |
| Lumo (East Coast) | 687 | 80.6% | 17.8% |
Operators with their own page for this station are linked to it.
Late train at Haymarket? Delay Repay
These operators call at Haymarket and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- TransPennine Express: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Avanti: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,135 | 83.6% | 1.0% |
| Period 6 of 2026-27 | 15,628 | 85.5% | 1.8% |
| Period 5 of 2026-27 | 15,745 | 83.0% | 1.6% |
| Period 4 of 2026-27 | 15,577 | 83.2% | 2.8% |
| Period 3 of 2026-27 | 15,677 | 85.8% | 1.6% |
| Period 2 of 2026-27 | 15,577 | 86.1% | 1.8% |
| Period 1 of 2026-27 | 17,639 | 87.6% | 1.6% |
| Period 13 of 2025-26 | 16,193 | 89.2% | 1.8% |
| Period 12 of 2025-26 | 15,628 | 87.6% | 1.4% |
| Period 11 of 2025-26 | 13,997 | 85.4% | 1.2% |
| Period 10 of 2025-26 | 13,507 | 84.5% | 1.5% |
| Period 9 of 2025-26 | 15,416 | 80.6% | 2.3% |
| Period 8 of 2025-26 | 15,372 | 81.8% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Glasgow Queen Street | 200,788 | 86.8% | 1.2% |
| Edinburgh | 275,983 | 84.8% | 1.6% |
| Partick | 145,005 | 83.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out