Williamwood
WLMScotlandManaged by ScotRail
How this station is performing
Williamwood had 25,397 scheduled stops to Period 7 of 2026-27, about 70 a day. 97.4% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Williamwood opened on 8 July 1929, 97 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Williamwood is the newest; the oldest, Clarkston, opened in 1866.
The nearest stations to Williamwood are Clarkston (1.0 km south-east), Giffnock (1.1 km north), Whitecraigs (1.3 km west), Muirend (2.1 km north-east) and Thornliebank (2.3 km north-west). 58 stations lie within 10 km in all. At 97.4%, Williamwood is more punctual than every one of them; the best of the five, Muirend, manages 97.4%.
Williamwood is among the most punctual stations in Britain. Its 97.4% puts it 29th out of 2,374 ranked stations, with 28 ahead of it and 2,345 behind, and 13.5 percentage points above the national median of 83.9%.
In Scotland, Williamwood ranks 4th of 313 ranked stations. Its 97.4% is 9.7 percentage points better than the area median of 87.7%.
1 of 3 stations of a similar size in Scotland are more punctual than Williamwood on 97.4%. The comparison group includes Muirend (97.4%), Neilston (97.6%) and Patterton (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,397 | 97.4% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Williamwood? Delay Repay
These operators call at Williamwood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,040 | 97.4% | 0.5% |
| Period 6 of 2026-27 | 2,040 | 98.4% | 0.6% |
| Period 5 of 2026-27 | 1,780 | 98.0% | 0.6% |
| Period 4 of 2026-27 | 2,040 | 97.5% | 0.8% |
| Period 3 of 2026-27 | 2,040 | 97.1% | 3.3% |
| Period 2 of 2026-27 | 2,035 | 97.5% | 1.2% |
| Period 1 of 2026-27 | 2,338 | 97.5% | 0.6% |
| Period 13 of 2025-26 | 1,080 | 98.7% | 2.1% |
| Period 12 of 2025-26 | 2,040 | 96.7% | 0.6% |
| Period 11 of 2025-26 | 2,040 | 97.4% | 0.3% |
| Period 10 of 2025-26 | 1,841 | 97.5% | 1.3% |
| Period 9 of 2025-26 | 2,043 | 95.8% | 2.8% |
| Period 8 of 2025-26 | 2,040 | 97.4% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out