Glasgow Queen Street
GLQScotlandManaged by ScotRail
How this station is performing
Glasgow Queen Street had 200,788 scheduled stops to Period 7 of 2026-27, about 552 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Glasgow Queen Street opened on 21 February 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Glasgow Queen Street is the oldest; the next oldest, High Street (Glasgow), dates from 1871.
The nearest stations to Glasgow Queen Street are Argyle Street (0.5 km south), Glasgow Central (0.7 km south-west), High Street (Glasgow) (0.8 km south-east), Charing Cross (Glasgow) (1.2 km west) and Anderston (1.2 km west). 81 stations lie within 10 km in all. Of the five, Glasgow Central is the most punctual at 87.8% and Anderston the least at 84.2%, with Glasgow Queen Street on 86.8%.
Glasgow Queen Street is named after Glasgow, a big city, home to about 626,410 people, but the station stands 0.2 km from its centre.
3 operators call at Glasgow Queen Street: ScotRail (86.8%, 100% of stops), Lumo (East Coast) (86.1%, 0% of stops) and Caledonian Sleeper (–, 0% of stops). They are close together, with ScotRail leading on 86.8% and Lumo (East Coast) trailing on 86.1%, a gap of 0.7 percentage points.
Compared with 3 stations of a similar size in Scotland, Glasgow Queen Street is the most punctual, at 86.8%. The comparison group includes Haymarket (85.0%), Edinburgh (84.8%) and Partick (83.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 199,820 | 86.8% | 1.1% |
| Lumo (East Coast) | 687 | 86.1% | 17.8% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Glasgow Queen Street? Delay Repay
These operators call at Glasgow Queen Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,389 | 85.1% | 0.8% |
| Period 6 of 2026-27 | 15,447 | 89.5% | 1.0% |
| Period 5 of 2026-27 | 15,441 | 87.6% | 1.2% |
| Period 4 of 2026-27 | 15,048 | 87.7% | 2.1% |
| Period 3 of 2026-27 | 15,399 | 88.4% | 1.4% |
| Period 2 of 2026-27 | 15,385 | 88.9% | 0.9% |
| Period 1 of 2026-27 | 17,705 | 88.2% | 1.2% |
| Period 13 of 2025-26 | 16,742 | 88.6% | 1.0% |
| Period 12 of 2025-26 | 15,125 | 89.0% | 0.7% |
| Period 11 of 2025-26 | 15,246 | 85.2% | 1.0% |
| Period 10 of 2025-26 | 13,363 | 86.4% | 0.9% |
| Period 9 of 2025-26 | 15,290 | 80.9% | 1.6% |
| Period 8 of 2025-26 | 15,208 | 82.0% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out