Blair Atholl
BLAScotlandManaged by ScotRail
How this station is performing
Blair Atholl had 4,222 scheduled stops to Period 7 of 2026-27, about 12 a day. 54.5% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Blair Atholl opened on 9 September 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Blair Atholl is the newest; the oldest, Dunkeld and Birnam, opened in 1856.
The nearest stations to Blair Atholl are Pitlochry (9.8 km south-east), Dunkeld and Birnam (28.6 km south-east), Dalwhinnie (30.6 km north-west), Newtonmore (36.5 km north-west) and Kingussie (36.9 km north). 1 stations lie within 10 km in all. Of the five, Dunkeld and Birnam is the most punctual at 66.3% and Dalwhinnie the least at 53.3%, with Blair Atholl on 54.5%.
Blair Atholl takes its name from a town called Blair Atholl, and the station stands 0.8 km from its centre.
For Blair Atholl, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 33.9% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 78.2%, which is 44.3 percentage points higher. Cancellations peaked at 6.5% of scheduled stops in Period 9 of 2024-25, against 1.3% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Blair Atholl on 54.5%. The comparison group includes Fearn (82.8%), Carrbridge (68.5%) and Dalwhinnie (53.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 3,555 | 53.8% | 1.1% |
| Caledonian Sleeper | 618 | – | – |
| LNER | 49 | – | – |
Operators with their own page for this station are linked to it.
Late train at Blair Atholl? Delay Repay
These operators call at Blair Atholl and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 340 | 39.6% | 1.8% |
| Period 6 of 2026-27 | 340 | 60.8% | 0.6% |
| Period 5 of 2026-27 | 340 | 58.4% | 4.7% |
| Period 4 of 2026-27 | 340 | 55.2% | 0.0% |
| Period 3 of 2026-27 | 337 | 62.0% | 0.3% |
| Period 2 of 2026-27 | 328 | 65.0% | 0.6% |
| Period 1 of 2026-27 | 361 | 63.9% | 1.9% |
| Period 13 of 2025-26 | 349 | 67.5% | 0.9% |
| Period 12 of 2025-26 | 316 | 60.9% | 0.0% |
| Period 11 of 2025-26 | 316 | 45.2% | 2.8% |
| Period 10 of 2025-26 | 269 | 44.4% | 0.0% |
| Period 9 of 2025-26 | 316 | 42.8% | 1.3% |
| Period 8 of 2025-26 | 270 | 33.9% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fearn | 4,298 | 82.8% | 2.7% |
| Carrbridge | 4,317 | 68.5% | 1.3% |
| Dalwhinnie | 3,989 | 53.3% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out