Neilston
NEIScotlandManaged by ScotRail
How this station is performing
Neilston had 25,397 scheduled stops to Period 7 of 2026-27, about 70 a day. 97.6% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Neilston opened on 1 May 1903, 123 years before the latest figures here, and has not been moved since. The First World War closed Neilston on 1 January 1917, and it reopened on 1 February 1919. Among the 5 stations nearest to it with a known opening date, Barrhead is the oldest (1848) and Priesthill and Darnley the newest (1990), with Neilston in between.
The nearest stations to Neilston are Barrhead (3.0 km north-east), Nitshill (5.3 km north-east), Patterton (5.8 km east), Priesthill and Darnley (6.2 km north-east) and Paisley Canal (6.4 km north). 26 stations lie within 10 km in all. At 97.6%, Neilston is more punctual than every one of them; the best of the five, Patterton, manages 96.6%.
Neilston takes its name from a Village called Neilston, home to about 5,170 people, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in Scotland, Neilston is the most punctual, at 97.6%. The comparison group includes Muirend (97.4%), Patterton (96.6%) and Williamwood (97.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,397 | 97.6% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Neilston? Delay Repay
These operators call at Neilston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,040 | 96.4% | 0.6% |
| Period 6 of 2026-27 | 2,040 | 98.4% | 0.7% |
| Period 5 of 2026-27 | 1,780 | 98.1% | 0.6% |
| Period 4 of 2026-27 | 2,040 | 97.9% | 0.8% |
| Period 3 of 2026-27 | 2,040 | 97.8% | 3.3% |
| Period 2 of 2026-27 | 2,035 | 97.9% | 1.2% |
| Period 1 of 2026-27 | 2,338 | 97.9% | 0.6% |
| Period 13 of 2025-26 | 1,080 | 99.1% | 2.1% |
| Period 12 of 2025-26 | 2,040 | 97.6% | 0.6% |
| Period 11 of 2025-26 | 2,040 | 97.9% | 0.3% |
| Period 10 of 2025-26 | 1,841 | 97.6% | 1.3% |
| Period 9 of 2025-26 | 2,043 | 95.7% | 2.8% |
| Period 8 of 2025-26 | 2,040 | 97.2% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Muirend | 25,397 | 97.4% | 1.1% |
| Patterton | 25,397 | 96.6% | 1.2% |
| Williamwood | 25,397 | 97.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out