St Albans Abbey
SAAEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
St Albans Abbey had 13,579 scheduled stops to Period 7 of 2026-27, about 37 a day. 95.7% of recorded arrivals were within three minutes of the timetable and 6.3% of scheduled stops were cancelled.
St Albans Abbey opened on 5 May 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, St Albans Abbey is the oldest; the next oldest, Park Street, dates from 1858.
The nearest stations to St Albans Abbey are St Albans City (1.2 km north-east), Park Street (2.1 km south), How Wood (Hertfordshire) (3.0 km south), Bricket Wood (4.5 km south) and Radlett (6.8 km south). 14 stations lie within 10 km in all. Of the five, Park Street is the most punctual at 96.6% and Radlett the least at 72.1%, with St Albans Abbey on 95.7%.
St Albans Abbey is named after St Albans, a city, home to about 82,146 people, but the station stands 1.2 km from its centre.
1 of 3 stations of a similar size in East of England are more punctual than St Albans Abbey on 95.7%. The comparison group includes Watford North (95.6%), Oulton Broad North (95.9%) and Elmswell (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,579 | 95.7% | 6.3% |
Operators with their own page for this station are linked to it.
Late train at St Albans Abbey? Delay Repay
These operators call at St Albans Abbey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,058 | 84.5% | 4.3% |
| Period 6 of 2026-27 | 1,060 | 96.4% | 9.3% |
| Period 5 of 2026-27 | 1,045 | 96.7% | 7.0% |
| Period 4 of 2026-27 | 1,050 | 97.1% | 6.7% |
| Period 3 of 2026-27 | 1,028 | 98.2% | 6.0% |
| Period 2 of 2026-27 | 994 | 96.4% | 6.0% |
| Period 1 of 2026-27 | 992 | 96.2% | 1.4% |
| Period 13 of 2025-26 | 1,182 | 99.2% | 8.1% |
| Period 12 of 2025-26 | 1,070 | 95.8% | 4.3% |
| Period 11 of 2025-26 | 1,070 | 96.0% | 4.7% |
| Period 10 of 2025-26 | 964 | 96.8% | 11.5% |
| Period 9 of 2025-26 | 1,032 | 96.1% | 8.9% |
| Period 8 of 2025-26 | 1,034 | 94.8% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Watford North | 13,578 | 95.6% | 6.3% |
| Oulton Broad North | 13,564 | 95.9% | 0.8% |
| Elmswell | 13,459 | 84.8% | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out