Smethwick Galton Bridge
SGBWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Smethwick Galton Bridge had 90,011 scheduled stops to Period 7 of 2026-27, about 247 a day. 80.2% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Smethwick Galton Bridge opened on 25 September 1995, 31 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Smethwick Galton Bridge is the newest; the oldest, Smethwick Rolfe Street, opened in 1852.
The nearest stations to Smethwick Galton Bridge are Smethwick Rolfe Street (1.0 km south-east), The Hawthorns (1.1 km east), Langley Green (1.9 km south-west), Sandwell and Dudley (2.2 km west) and Rowley Regis (4.4 km south-west). 31 stations lie within 10 km in all. Of the five, Langley Green is the most punctual at 89.0% and Sandwell and Dudley the least at 69.0%, with Smethwick Galton Bridge on 80.2%.
Smethwick Galton Bridge is named after Smethwick, a town, home to about 48,180 people, but the station stands 1.3 km from its centre.
Compared with 3 stations of a similar size in West Midlands, Smethwick Galton Bridge is the most punctual, at 80.2%. The comparison group includes Stafford (58.4%), Coventry (62.5%) and Birmingham International (66.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 89,435 | 80.1% | 3.6% |
| Chiltern Railways | 576 | – | – |
Operators with their own page for this station are linked to it.
Late train at Smethwick Galton Bridge? Delay Repay
These operators call at Smethwick Galton Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,075 | 78.8% | 2.1% |
| Period 6 of 2026-27 | 7,048 | 79.9% | 2.0% |
| Period 5 of 2026-27 | 6,194 | 75.5% | 5.2% |
| Period 4 of 2026-27 | 6,603 | 73.9% | 5.8% |
| Period 3 of 2026-27 | 6,756 | 80.5% | 2.9% |
| Period 2 of 2026-27 | 6,563 | 80.9% | 5.1% |
| Period 1 of 2026-27 | 8,096 | 84.4% | 2.9% |
| Period 13 of 2025-26 | 7,245 | 85.0% | 4.7% |
| Period 12 of 2025-26 | 7,012 | 85.5% | 1.7% |
| Period 11 of 2025-26 | 6,930 | 85.2% | 4.9% |
| Period 10 of 2025-26 | 6,365 | 80.9% | 3.2% |
| Period 9 of 2025-26 | 7,066 | 72.7% | 3.6% |
| Period 8 of 2025-26 | 7,058 | 77.5% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stafford | 99,345 | 58.4% | 4.3% |
| Coventry | 80,823 | 62.5% | 5.8% |
| Birmingham International | 101,542 | 66.8% | 5.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out