Watford North
WFNEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Watford North had 13,578 scheduled stops to Period 7 of 2026-27, about 37 a day. 95.6% of recorded arrivals were within three minutes of the timetable and 6.3% of scheduled stops were cancelled.
Watford North opened on 1 October 1910, 116 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bushey is the oldest (1841) and Garston (Hertfordshire) the newest (1966), with Watford North in between.
The nearest stations to Watford North are Watford Junction (1.3 km south), Garston (Hertfordshire) (1.4 km north-east), Watford High Street (2.5 km south), Bushey (3.3 km south) and Bricket Wood (4.0 km north-east). 19 stations lie within 10 km in all. Of the five, Garston (Hertfordshire) is the most punctual at 96.3% and Watford Junction the least at 81.5%, with Watford North on 95.6%.
Watford North is named after Watford, a market town, home to about 90,301 people, but the station stands 2.2 km from its centre.
2 of 3 stations of a similar size in East of England are more punctual than Watford North on 95.6%. The comparison group includes St Albans Abbey (95.7%), Oulton Broad North (95.9%) and Elmswell (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,578 | 95.6% | 6.3% |
Operators with their own page for this station are linked to it.
Late train at Watford North? Delay Repay
These operators call at Watford North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,058 | 82.4% | 4.3% |
| Period 6 of 2026-27 | 1,060 | 95.7% | 9.3% |
| Period 5 of 2026-27 | 1,044 | 97.4% | 7.0% |
| Period 4 of 2026-27 | 1,050 | 97.1% | 6.7% |
| Period 3 of 2026-27 | 1,028 | 98.4% | 6.0% |
| Period 2 of 2026-27 | 994 | 94.9% | 6.0% |
| Period 1 of 2026-27 | 992 | 96.6% | 1.3% |
| Period 13 of 2025-26 | 1,182 | 98.6% | 8.0% |
| Period 12 of 2025-26 | 1,070 | 96.4% | 4.2% |
| Period 11 of 2025-26 | 1,070 | 95.8% | 4.7% |
| Period 10 of 2025-26 | 964 | 97.5% | 11.5% |
| Period 9 of 2025-26 | 1,032 | 95.9% | 9.0% |
| Period 8 of 2025-26 | 1,034 | 95.8% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| St Albans Abbey | 13,579 | 95.7% | 6.3% |
| Oulton Broad North | 13,564 | 95.9% | 0.8% |
| Elmswell | 13,459 | 84.8% | 0.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out