Stafford
STAWest MidlandsManaged by Avanti West Coast
How this station is performing
Stafford had 99,345 scheduled stops to Period 7 of 2026-27, about 273 a day. 58.4% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Stafford opened on 4 July 1837, 189 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Stafford is the oldest; the next oldest, Penkridge, dates from 1837.
The nearest stations to Stafford are Penkridge (8.9 km south), Stone (Staffs) (11.8 km north), Hednesford (13.2 km south-east), Rugeley Trent Valley (13.5 km east) and Rugeley Town (13.6 km south-east). 1 stations lie within 10 km in all. Of the five, Rugeley Town is the most punctual at 94.3% and Penkridge the least at 57.1%, with Stafford on 58.4%.
Stafford is one of 2 stations named after a county town called Stafford, home to about 70,592 people; this one stands 0.5 km from its centre.
3 operators call at Stafford: West Midlands Railway (59.6%, 45% of stops), Avanti (56.3%, 34% of stops) and CrossCountry (59.1%, 21% of stops). They are close together, with West Midlands Railway leading on 59.6% and Avanti trailing on 56.3%, a gap of 3.3 percentage points.
Compared with 3 stations of a similar size in West Midlands, Stafford is the least punctual, at 58.4%. All of them are ahead, including Birmingham International (66.8%), Smethwick Galton Bridge (80.2%) and Stourbridge Junction (95.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 44,628 | 59.6% | 4.0% |
| Avanti | 33,455 | 56.3% | 4.4% |
| CrossCountry | 21,262 | 59.1% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Stafford? Delay Repay
These operators call at Stafford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,598 | 58.6% | 2.5% |
| Period 6 of 2026-27 | 7,626 | 52.7% | 2.9% |
| Period 5 of 2026-27 | 7,624 | 54.3% | 4.9% |
| Period 4 of 2026-27 | 7,442 | 47.4% | 8.0% |
| Period 3 of 2026-27 | 7,540 | 57.0% | 3.7% |
| Period 2 of 2026-27 | 7,332 | 58.0% | 4.8% |
| Period 1 of 2026-27 | 8,582 | 67.6% | 3.0% |
| Period 13 of 2025-26 | 8,360 | 66.3% | 5.0% |
| Period 12 of 2025-26 | 7,690 | 64.0% | 2.6% |
| Period 11 of 2025-26 | 7,557 | 63.6% | 5.5% |
| Period 10 of 2025-26 | 6,659 | 61.1% | 4.2% |
| Period 9 of 2025-26 | 7,671 | 48.3% | 6.4% |
| Period 8 of 2025-26 | 7,664 | 58.1% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birmingham International | 101,542 | 66.8% | 5.5% |
| Smethwick Galton Bridge | 90,011 | 80.2% | 3.6% |
| Stourbridge Junction | 113,557 | 95.2% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out