Park Street
PKTEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Park Street had 13,363 scheduled stops to Period 7 of 2026-27, about 37 a day. 96.6% of recorded arrivals were within three minutes of the timetable and 6.3% of scheduled stops were cancelled.
Park Street opened on 5 May 1858. It was moved to the site it uses now on 24 May 1890. Of the 5 stations nearest to it with a known opening date, Park Street is the oldest; the next oldest, St Albans Abbey, dates from 1858.
The nearest stations to Park Street are How Wood (Hertfordshire) (0.9 km south), St Albans Abbey (2.1 km north), Bricket Wood (2.6 km south-west), St Albans City (2.9 km north) and Radlett (4.8 km south). 17 stations lie within 10 km in all. At 96.6%, Park Street is more punctual than every one of them; the best of the five, How Wood (Hertfordshire), manages 96.2%.
Park Street takes its name from a Village called Park Street, home to about 6,781 people, and the station stands 0.4 km from its centre.
Compared with 3 stations of a similar size in East of England, Park Street is the most punctual, at 96.6%. The comparison group includes Bricket Wood (95.4%), Garston (Hertfordshire) (96.3%) and How Wood (Hertfordshire) (96.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,363 | 96.6% | 6.3% |
Operators with their own page for this station are linked to it.
Late train at Park Street? Delay Repay
These operators call at Park Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,042 | 86.0% | 4.1% |
| Period 6 of 2026-27 | 1,040 | 96.4% | 9.1% |
| Period 5 of 2026-27 | 1,025 | 98.0% | 7.0% |
| Period 4 of 2026-27 | 1,030 | 97.0% | 6.5% |
| Period 3 of 2026-27 | 1,009 | 99.0% | 5.8% |
| Period 2 of 2026-27 | 975 | 96.0% | 6.1% |
| Period 1 of 2026-27 | 973 | 97.5% | 2.0% |
| Period 13 of 2025-26 | 1,160 | 99.6% | 8.1% |
| Period 12 of 2025-26 | 1,050 | 96.8% | 4.2% |
| Period 11 of 2025-26 | 1,050 | 96.1% | 4.8% |
| Period 10 of 2025-26 | 950 | 98.4% | 11.4% |
| Period 9 of 2025-26 | 1,029 | 97.4% | 8.9% |
| Period 8 of 2025-26 | 1,030 | 96.6% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bricket Wood | 13,363 | 95.4% | 6.2% |
| Garston (Hertfordshire) | 13,363 | 96.3% | 6.2% |
| How Wood (Hertfordshire) | 13,363 | 96.2% | 6.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out