Birmingham New Street
BHMWest MidlandsManaged by Network Rail
How this station is performing
Birmingham New Street had 323,821 scheduled stops to Period 7 of 2026-27, about 890 a day. 67.9% of recorded arrivals were within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Birmingham New Street opened on 1 June 1854, 172 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Birmingham Snow Hill is the oldest (1852) and Jewellery Quarter the newest (1995), with Birmingham New Street in between.
The nearest stations to Birmingham New Street are Birmingham Moor Street (0.4 km east), Birmingham Snow Hill (0.7 km north), Five Ways (1.2 km south-west), Bordesley (1.6 km south-east) and Jewellery Quarter (1.7 km north-west). 38 stations lie within 10 km in all. At 67.9%, Birmingham New Street is less punctual than all of them; the best of the five, Birmingham Moor Street, manages 87.8%.
Birmingham New Street is named after Birmingham, a college town, home to about 1,137,100 people, but the station stands 0.4 km from its centre.
4 operators call at Birmingham New Street: West Midlands Railway (74.3%, 60% of stops), CrossCountry (57.6%, 27% of stops), Avanti (53.6%, 10% of stops) and Transport for Wales (74.3%, 4% of stops). The operator you travel with matters: West Midlands Railway reaches 74.3% within three minutes while Avanti manages 53.6%, a gap of 20.7 percentage points.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 193,667 | 74.3% | 3.1% |
| CrossCountry | 86,296 | 57.6% | 4.8% |
| Avanti | 32,299 | 53.6% | 9.2% |
| Transport for Wales | 11,559 | 74.3% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Birmingham New Street? Delay Repay
These operators call at Birmingham New Street and publish Delay Repay rules.
- West Midlands Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Avanti: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Transport for Wales: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 26,075 | 64.5% | 3.5% |
| Period 6 of 2026-27 | 25,903 | 63.4% | 3.9% |
| Period 5 of 2026-27 | 25,483 | 65.5% | 4.4% |
| Period 4 of 2026-27 | 24,509 | 59.0% | 6.9% |
| Period 3 of 2026-27 | 24,125 | 68.7% | 3.7% |
| Period 2 of 2026-27 | 24,854 | 69.5% | 5.7% |
| Period 1 of 2026-27 | 29,168 | 74.1% | 2.5% |
| Period 13 of 2025-26 | 26,315 | 74.2% | 3.7% |
| Period 12 of 2025-26 | 24,099 | 75.1% | 2.3% |
| Period 11 of 2025-26 | 23,782 | 74.6% | 5.8% |
| Period 10 of 2025-26 | 21,441 | 70.2% | 4.6% |
| Period 9 of 2025-26 | 24,342 | 58.6% | 5.0% |
| Period 8 of 2025-26 | 23,725 | 64.6% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out