Acton Bridge (Cheshire) had 12,512 scheduled stops to Period 7 of 2026-27, about 34 a day. 61.3% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Acton Bridge (Cheshire) opened on 4 July 1837, 189 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Acton Bridge (Cheshire) is the oldest; the next oldest, Hartford (Cheshire), dates from 1837.
The nearest stations to Acton Bridge (Cheshire) are Cuddington (2.9 km south), Hartford (Cheshire) (4.2 km south-east), Greenbank (4.8 km east), Delamere (5.9 km south-west) and Northwich (7.1 km east). 9 stations lie within 10 km in all. At 61.3%, Acton Bridge (Cheshire) is less punctual than all of them; the best of the five, Delamere, manages 87.0%.
Acton Bridge (Cheshire) is named after Acton Bridge, a Village, home to about 631 people, but the station stands 2.1 km from its centre.
Across the whole run of data, the weakest four-week period for Acton Bridge (Cheshire) was Period 9 of 2024-25, at 50.9%, some time before the latest year. The strongest was Period 1 of 2023-24, at 77.3%, and the two are 26.4 percentage points apart. Cancellations peaked at 8.8% of scheduled stops in Period 4 of 2026-27, against 4.4% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Acton Bridge (Cheshire) is the least punctual, at 61.3%. All of them are ahead, including Cherry Tree (84.2%), Moorside (87.2%) and Pleasington (85.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,512 | 61.3% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Acton Bridge (Cheshire)? Delay Repay
These operators call at Acton Bridge (Cheshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 956 | 60.7% | 2.5% |
| Period 6 of 2026-27 | 956 | 57.8% | 2.0% |
| Period 5 of 2026-27 | 956 | 55.9% | 4.9% |
| Period 4 of 2026-27 | 932 | 52.4% | 8.8% |
| Period 3 of 2026-27 | 952 | 58.8% | 4.4% |
| Period 2 of 2026-27 | 939 | 60.4% | 6.7% |
| Period 1 of 2026-27 | 1,095 | 70.0% | 2.2% |
| Period 13 of 2025-26 | 1,056 | 65.9% | 3.8% |
| Period 12 of 2025-26 | 957 | 68.3% | 3.3% |
| Period 11 of 2025-26 | 954 | 63.1% | 7.2% |
| Period 10 of 2025-26 | 870 | 60.6% | 3.7% |
| Period 9 of 2025-26 | 933 | 55.9% | 5.9% |
| Period 8 of 2025-26 | 956 | 63.5% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cherry Tree | 12,498 | 84.2% | 3.0% |
| Moorside | 12,498 | 87.2% | 4.1% |
| Pleasington | 12,498 | 85.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out