Garston (Hertfordshire)
GSNEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Garston (Hertfordshire) had 13,363 scheduled stops to Period 7 of 2026-27, about 37 a day. 96.3% of recorded arrivals were within three minutes of the timetable and 6.2% of scheduled stops were cancelled.
Garston (Hertfordshire) opened on 7 February 1966, 60 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bricket Wood is the oldest (1858) and How Wood (Hertfordshire) the newest (1988), with Garston (Hertfordshire) in between.
The nearest stations to Garston (Hertfordshire) are Watford North (1.4 km south-west), Bricket Wood (2.6 km north-east), Watford Junction (2.7 km south), Watford High Street (3.9 km south) and How Wood (Hertfordshire) (4.3 km north-east). 18 stations lie within 10 km in all. At 96.3%, Garston (Hertfordshire) is more punctual than every one of them; the best of the five, How Wood (Hertfordshire), manages 96.2%.
Garston (Hertfordshire) is named after Garston, a Village, home to about 33,000 people, but the station stands 0.3 km from its centre.
1 of 3 stations of a similar size in East of England are more punctual than Garston (Hertfordshire) on 96.3%. The comparison group includes Bricket Wood (95.4%), How Wood (Hertfordshire) (96.2%) and Park Street (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,363 | 96.3% | 6.2% |
Operators with their own page for this station are linked to it.
Late train at Garston (Hertfordshire)? Delay Repay
These operators call at Garston (Hertfordshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,042 | 83.4% | 4.1% |
| Period 6 of 2026-27 | 1,040 | 96.8% | 9.0% |
| Period 5 of 2026-27 | 1,025 | 98.0% | 7.0% |
| Period 4 of 2026-27 | 1,030 | 97.0% | 6.5% |
| Period 3 of 2026-27 | 1,009 | 98.7% | 5.7% |
| Period 2 of 2026-27 | 975 | 95.6% | 6.1% |
| Period 1 of 2026-27 | 973 | 97.5% | 1.4% |
| Period 13 of 2025-26 | 1,160 | 99.0% | 8.2% |
| Period 12 of 2025-26 | 1,050 | 96.9% | 4.1% |
| Period 11 of 2025-26 | 1,050 | 96.8% | 4.8% |
| Period 10 of 2025-26 | 950 | 98.0% | 11.4% |
| Period 9 of 2025-26 | 1,029 | 97.4% | 9.0% |
| Period 8 of 2025-26 | 1,030 | 96.6% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bricket Wood | 13,363 | 95.4% | 6.2% |
| How Wood (Hertfordshire) | 13,363 | 96.2% | 6.2% |
| Park Street | 13,363 | 96.6% | 6.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out