Moreton (Merseyside)
MRTNorth WestManaged by Merseyrail
How this station is performing
Moreton (Merseyside) had 40,363 scheduled stops to Period 7 of 2026-27, about 111 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Moreton (Merseyside) opened on 18 June 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moreton (Merseyside) is the oldest; the next oldest, Bidston, dates from 1866.
The nearest stations to Moreton (Merseyside) are Leasowe (0.9 km east), Bidston (2.3 km east), Meols (2.9 km west), Upton (Merseyside) (3.0 km south-east) and Wallasey Village (3.4 km north-east). 31 stations lie within 10 km in all. Of the five, Bidston is the most punctual at 88.7% and Leasowe the least at 72.4%, with Moreton (Merseyside) on 87.0%.
Moreton (Merseyside) is named after Moreton, a town, home to about 17,670 people, but the station stands 0.7 km from its centre.
For Moreton (Merseyside), the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 79.4% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.5%, which is 16.1 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 11 of 2024-25, against 1.7% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Moreton (Merseyside) is the least punctual, at 87.0%. All of them are ahead, including Hoylake (89.5%), Manor Road (98.4%) and West Kirby (93.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,363 | 87.0% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Moreton (Merseyside)? Delay Repay
These operators call at Moreton (Merseyside) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,084 | 92.6% | 1.2% |
| Period 6 of 2026-27 | 3,084 | 92.4% | 2.5% |
| Period 5 of 2026-27 | 3,084 | 86.2% | 2.7% |
| Period 4 of 2026-27 | 2,903 | 85.3% | 1.7% |
| Period 3 of 2026-27 | 3,084 | 88.2% | 1.8% |
| Period 2 of 2026-27 | 3,084 | 85.0% | 1.2% |
| Period 1 of 2026-27 | 3,556 | 87.4% | 1.6% |
| Period 13 of 2025-26 | 3,384 | 88.1% | 0.8% |
| Period 12 of 2025-26 | 3,084 | 86.5% | 2.6% |
| Period 11 of 2025-26 | 3,084 | 90.0% | 1.1% |
| Period 10 of 2025-26 | 2,757 | 83.1% | 1.3% |
| Period 9 of 2025-26 | 3,083 | 79.4% | 2.5% |
| Period 8 of 2025-26 | 3,092 | 86.2% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hoylake | 40,363 | 89.5% | 1.8% |
| Manor Road | 40,363 | 98.4% | 1.7% |
| West Kirby | 40,584 | 93.2% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out