Sandhills
SDLNorth WestManaged by Merseyrail
How this station is performing
Sandhills had 136,757 scheduled stops to Period 7 of 2026-27, about 376 a day. 95.0% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Sandhills opened on 4 July 1854. It was moved to the site it uses now on 9 July 1881. Among the 5 stations nearest to it with a known opening date, Kirkdale is the oldest (1848) and Moorfields the newest (1977), with Sandhills in between.
The nearest stations to Sandhills are Bank Hall (1.0 km north), Kirkdale (1.5 km north-east), Bootle Oriel Road (1.9 km north), Moorfields (2.3 km south) and Bootle New Strand (2.6 km north). 48 stations lie within 10 km in all. At 95.0%, Sandhills is more punctual than every one of them; the best of the five, Bank Hall, manages 94.9%.
In North West, Sandhills ranks 9th of 315 ranked stations. Its 95.0% is 13.6 percentage points better than the area median of 81.4%.
Across the whole run of data, the weakest four-week period for Sandhills was Period 5 of 2024-25, at 91.1%, some time before the latest year. The strongest was Period 6 of 2026-27, at 97.0%, and the two are 5.9 percentage points apart. Cancellations peaked at 5.1% of scheduled stops in Period 11 of 2024-25, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Sandhills is the most punctual, at 95.0%. The comparison group includes Manchester Victoria (72.4%), Preston (Lancs) (72.8%) and Chester (82.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 136,757 | 95.0% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Sandhills? Delay Repay
These operators call at Sandhills and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,400 | 96.4% | 1.5% |
| Period 6 of 2026-27 | 10,533 | 97.0% | 1.4% |
| Period 5 of 2026-27 | 10,562 | 96.0% | 1.4% |
| Period 4 of 2026-27 | 9,943 | 93.6% | 1.3% |
| Period 3 of 2026-27 | 10,242 | 95.6% | 2.8% |
| Period 2 of 2026-27 | 10,459 | 96.3% | 1.1% |
| Period 1 of 2026-27 | 11,887 | 94.2% | 3.5% |
| Period 13 of 2025-26 | 11,446 | 96.4% | 1.6% |
| Period 12 of 2025-26 | 10,435 | 95.4% | 1.0% |
| Period 11 of 2025-26 | 10,474 | 94.5% | 1.8% |
| Period 10 of 2025-26 | 9,481 | 94.2% | 1.5% |
| Period 9 of 2025-26 | 10,418 | 93.1% | 1.5% |
| Period 8 of 2025-26 | 10,477 | 91.6% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Manchester Victoria | 135,103 | 72.4% | 2.9% |
| Preston (Lancs) | 133,423 | 72.8% | 3.6% |
| Chester | 132,487 | 82.8% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out