Moorfields
MRFNorth WestManaged by Merseyrail
How this station is performing
Moorfields had 210,839 scheduled stops to Period 7 of 2026-27, about 579 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Moorfields opened on 2 May 1977, 49 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moorfields is the newest; the oldest, Liverpool Lime Street, opened in 1836.
The nearest stations to Moorfields are Liverpool James Street (0.5 km south-west), Liverpool Lime Street (0.8 km east), Liverpool Central (0.8 km south-east), Birkenhead Hamilton Square (2.2 km south-west) and Sandhills (2.3 km north). 48 stations lie within 10 km in all. Of the five, Sandhills is the most punctual at 95.0% and Liverpool Lime Street the least at 79.8%, with Moorfields on 92.6%.
In North West, Moorfields ranks 31st of 315 ranked stations. Its 92.6% is 11.2 percentage points better than the area median of 81.4%.
Across the whole run of data, the weakest four-week period for Moorfields was Period 11 of 2024-25, at 89.6%, some time before the latest year. The strongest was Period 4 of 2023-24, at 96.1%, and the two are 6.5 percentage points apart. Cancellations peaked at 5.7% of scheduled stops in Period 11 of 2024-25, against 2.0% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Moorfields is the most punctual, at 92.6%. The comparison group includes Liverpool Central (91.0%), Liverpool Lime Street (79.8%) and Crewe (67.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 210,839 | 92.6% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Moorfields? Delay Repay
These operators call at Moorfields and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 15,801 | 94.8% | 1.6% |
| Period 6 of 2026-27 | 16,226 | 94.2% | 2.0% |
| Period 5 of 2026-27 | 16,257 | 92.8% | 1.7% |
| Period 4 of 2026-27 | 15,295 | 91.5% | 1.5% |
| Period 3 of 2026-27 | 15,935 | 93.6% | 2.7% |
| Period 2 of 2026-27 | 16,147 | 93.9% | 1.4% |
| Period 1 of 2026-27 | 18,430 | 92.5% | 3.7% |
| Period 13 of 2025-26 | 17,700 | 93.1% | 1.5% |
| Period 12 of 2025-26 | 16,128 | 91.4% | 1.6% |
| Period 11 of 2025-26 | 16,158 | 91.6% | 2.2% |
| Period 10 of 2025-26 | 14,467 | 92.3% | 1.5% |
| Period 9 of 2025-26 | 16,116 | 90.5% | 1.9% |
| Period 8 of 2025-26 | 16,179 | 91.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Liverpool Central | 211,839 | 91.0% | 2.1% |
| Liverpool Lime Street | 240,964 | 79.8% | 3.2% |
| Crewe | 164,240 | 67.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out