Bache
BACNorth WestManaged by Merseyrail
How this station is performing
Bache had 40,811 scheduled stops to Period 7 of 2026-27, about 112 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Bache opened on 9 January 1984, 42 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Chester is the oldest (1848) and Overpool the newest (1988), with Bache in between.
The nearest stations to Bache are Chester (1.5 km south-east), Capenhurst (6.7 km north-west), Ellesmere Port (8.2 km north), Stanlow and Thornton (8.4 km north-east) and Overpool (8.7 km north). 10 stations lie within 10 km in all. Of the five, Overpool is the most punctual at 97.9% and Chester the least at 82.8%, with Bache on 87.6%.
Bache is one of 2 stations named after a suburb called Bache, home to about 307 people; this one stands 0.3 km from its centre.
For Bache, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 79.4% of stops arrived within three minutes of the timetable. The strongest was Period 7 of 2026-27, at 94.9%, which is 15.5 percentage points higher. Cancellations peaked at 7.3% of scheduled stops in Period 10 of 2023-24, against 2.9% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Bache on 87.6%. The comparison group includes Stalybridge (72.3%), Ashburys (90.3%) and West Kirby (93.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,811 | 87.6% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Bache? Delay Repay
These operators call at Bache and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,208 | 94.9% | 1.2% |
| Period 6 of 2026-27 | 3,101 | 87.0% | 4.2% |
| Period 5 of 2026-27 | 3,103 | 86.1% | 2.4% |
| Period 4 of 2026-27 | 2,925 | 79.4% | 3.1% |
| Period 3 of 2026-27 | 3,101 | 86.9% | 3.5% |
| Period 2 of 2026-27 | 3,101 | 89.0% | 2.2% |
| Period 1 of 2026-27 | 3,573 | 87.2% | 1.3% |
| Period 13 of 2025-26 | 3,405 | 86.9% | 1.7% |
| Period 12 of 2025-26 | 3,102 | 82.7% | 3.7% |
| Period 11 of 2025-26 | 3,100 | 85.1% | 6.8% |
| Period 10 of 2025-26 | 2,837 | 91.7% | 1.7% |
| Period 9 of 2025-26 | 3,159 | 89.5% | 1.8% |
| Period 8 of 2025-26 | 3,096 | 92.0% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stalybridge | 40,817 | 72.3% | 2.9% |
| Ashburys | 40,984 | 90.3% | 2.0% |
| West Kirby | 40,584 | 93.2% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out