Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Rock Ferry

RFYNorth WestManaged by Merseyrail

On time, last 13 periods87.3%Great Britain: 83.6%
Cancelled3.0%Great Britain: 3.2%
Stops a day185Scheduled, on average
Punctuality rank835th of 2,374Among ranked stations

How this station is performing

Rock Ferry had 67,319 scheduled stops to Period 7 of 2026-27, about 185 a day. 87.3% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.

Rock Ferry opened on 1 January 1863. It was moved to the site it uses now on 15 June 1891. Among the 5 stations nearest to it with a known opening date, Bebington is the oldest (1840) and Conway Park the newest (1998), with Rock Ferry in between.

The nearest stations to Rock Ferry are Green Lane (1.2 km north), Bebington (1.8 km south), Birkenhead Central (1.8 km north), Birkenhead Hamilton Square (2.4 km north) and Conway Park (2.4 km north). 44 stations lie within 10 km in all. Of the five, Conway Park is the most punctual at 91.8% and Birkenhead Central the least at 85.8%, with Rock Ferry on 87.3%.

Rock Ferry takes its name from a suburb called Rock Ferry, home to about 14,298 people, and the station stands 0.2 km from its centre.

1 of 3 stations of a similar size in North West are more punctual than Rock Ferry on 87.3%. The comparison group includes Lancaster (59.9%), Birkenhead Central (85.8%) and Green Lane (87.8%).

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 91.8%Period 2 of 2023-24: 93.7%Period 3 of 2023-24: 93.1%Period 4 of 2023-24: 91.3%Period 5 of 2023-24: 89.6%Period 6 of 2023-24: 89.8%Period 7 of 2023-24: 86.4%Period 8 of 2023-24: 88.3%Period 9 of 2023-24: 84.4%Period 10 of 2023-24: 84.9%Period 11 of 2023-24: 85.6%Period 12 of 2023-24: 87.5%Period 13 of 2023-24: 89.0%Period 1 of 2024-25: 90.1%Period 2 of 2024-25: 88.1%Period 3 of 2024-25: 88.9%Period 4 of 2024-25: 86.6%Period 5 of 2024-25: 85.8%Period 6 of 2024-25: 86.8%Period 7 of 2024-25: 88.9%Period 8 of 2024-25: 87.9%Period 9 of 2024-25: 83.6%Period 10 of 2024-25: 89.8%Period 11 of 2024-25: 82.4%Period 12 of 2024-25: 85.6%Period 13 of 2024-25: 87.1%Period 1 of 2025-26: 84.9%Period 2 of 2025-26: 85.0%Period 3 of 2025-26: 86.0%Period 4 of 2025-26: 86.8%Period 5 of 2025-26: 83.7%Period 6 of 2025-26: 86.7%Period 7 of 2025-26: 86.6%Period 8 of 2025-26: 91.3%Period 9 of 2025-26: 88.3%Period 10 of 2025-26: 91.6%Period 11 of 2025-26: 86.3%Period 12 of 2025-26: 83.5%Period 13 of 2025-26: 87.6%Period 1 of 2026-27: 87.1%Period 2 of 2026-27: 88.2%Period 3 of 2026-27: 86.1%Period 4 of 2026-27: 84.0%Period 5 of 2026-27: 86.1%Period 6 of 2026-27: 86.6%Period 7 of 2026-27: 88.0%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.6%Period 2 of 2023-24: 0.9%Period 3 of 2023-24: 1.2%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.9%Period 6 of 2023-24: 4.6%Period 7 of 2023-24: 4.8%Period 8 of 2023-24: 4.4%Period 9 of 2023-24: 3.8%Period 10 of 2023-24: 7.1%Period 11 of 2023-24: 5.7%Period 12 of 2023-24: 3.7%Period 13 of 2023-24: 3.9%Period 1 of 2024-25: 3.8%Period 2 of 2024-25: 4.9%Period 3 of 2024-25: 3.5%Period 4 of 2024-25: 3.4%Period 5 of 2024-25: 3.5%Period 6 of 2024-25: 3.4%Period 7 of 2024-25: 2.3%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 5.1%Period 10 of 2024-25: 2.0%Period 11 of 2024-25: 7.3%Period 12 of 2024-25: 2.6%Period 13 of 2024-25: 3.4%Period 1 of 2025-26: 2.6%Period 2 of 2025-26: 2.5%Period 3 of 2025-26: 2.9%Period 4 of 2025-26: 2.2%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 3.2%Period 7 of 2025-26: 3.5%Period 8 of 2025-26: 3.5%Period 9 of 2025-26: 1.5%Period 10 of 2025-26: 1.4%Period 11 of 2025-26: 5.6%Period 12 of 2025-26: 4.1%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 1.8%Period 2 of 2026-27: 1.9%Period 3 of 2026-27: 3.3%Period 4 of 2026-27: 4.0%Period 5 of 2026-27: 3.1%Period 6 of 2026-27: 5.0%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Merseyrail67,31987.3%3.0%

Operators with their own page for this station are linked to it.

Late train at Rock Ferry? Delay Repay

These operators call at Rock Ferry and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,22088.0%1.3%
Period 6 of 2026-275,12286.6%5.0%
Period 5 of 2026-275,11786.1%3.1%
Period 4 of 2026-274,80384.0%4.0%
Period 3 of 2026-275,11886.1%3.3%
Period 2 of 2026-275,12288.2%1.9%
Period 1 of 2026-275,88287.1%1.8%
Period 13 of 2025-265,63587.6%2.5%
Period 12 of 2025-265,12083.5%4.1%
Period 11 of 2025-265,11586.3%5.6%
Period 10 of 2025-264,71491.6%1.4%
Period 9 of 2025-265,17188.3%1.5%
Period 8 of 2025-265,18091.3%3.5%

Time of year

75%80%85%90%95%P1: 88.5%1P2: 88.7%2P3: 88.5%3P4: 87.2%4P5: 86.3%5P6: 87.5%6P7: 87.5%7P8: 89.2%8P9: 85.5%9P10: 88.9%10P11: 84.8%11P12: 85.5%12P13: 87.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Lancaster67,31959.9%3.7%
Birkenhead Central67,31785.8%1.7%
Green Lane67,27687.8%2.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out