Capenhurst
CPUNorth WestManaged by Merseyrail
How this station is performing
Capenhurst had 31,013 scheduled stops to Period 7 of 2026-27, about 85 a day. 87.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Capenhurst opened on 1 August 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hooton is the oldest (1840) and Eastham Rake the newest (1995), with Capenhurst in between.
The nearest stations to Capenhurst are Little Sutton (2.8 km north), Overpool (2.9 km north-east), Ellesmere Port (4.0 km north-east), Hooton (4.6 km north-west) and Eastham Rake (5.9 km north-west). 15 stations lie within 10 km in all. Of the five, Overpool is the most punctual at 97.9% and Little Sutton the least at 83.2%, with Capenhurst on 87.2%.
Capenhurst takes its name from a Village called Capenhurst, home to about 380 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Capenhurst was Period 9 of 2024-25, at 77.0%, some time before the latest year. The strongest was Period 7 of 2026-27, at 95.8%, and the two are 18.8 percentage points apart. Cancellations peaked at 7.5% of scheduled stops in Period 10 of 2023-24, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Capenhurst is the most punctual, at 87.2%. The comparison group includes Alderley Edge (81.3%), Mossley Hill (79.4%) and Ince (Manchester) (77.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 31,013 | 87.2% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Capenhurst? Delay Repay
These operators call at Capenhurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,208 | 95.8% | 1.2% |
| Period 6 of 2026-27 | 2,177 | 87.1% | 4.0% |
| Period 5 of 2026-27 | 2,179 | 85.7% | 2.2% |
| Period 4 of 2026-27 | 2,118 | 79.3% | 2.8% |
| Period 3 of 2026-27 | 2,177 | 86.6% | 3.3% |
| Period 2 of 2026-27 | 2,177 | 88.4% | 1.7% |
| Period 1 of 2026-27 | 2,611 | 87.3% | 1.3% |
| Period 13 of 2025-26 | 2,405 | 87.0% | 1.5% |
| Period 12 of 2025-26 | 2,178 | 83.2% | 3.4% |
| Period 11 of 2025-26 | 2,176 | 84.2% | 6.4% |
| Period 10 of 2025-26 | 2,836 | 90.0% | 1.7% |
| Period 9 of 2025-26 | 2,667 | 85.7% | 1.7% |
| Period 8 of 2025-26 | 2,104 | 88.3% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Alderley Edge | 31,016 | 81.3% | 2.4% |
| Mossley Hill | 31,004 | 79.4% | 3.9% |
| Ince (Manchester) | 31,309 | 77.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out