Fazakerley
FAZNorth WestManaged by Merseyrail
How this station is performing
Fazakerley had 43,024 scheduled stops to Period 7 of 2026-27, about 118 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Fazakerley opened on 20 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Fazakerley is the oldest; the next oldest, Rice Lane, dates from 1848.
The nearest stations to Fazakerley are Aintree (1.4 km north-west), Orrell Park (1.9 km south-west), Rice Lane (2.2 km south-west), Old Roan (2.2 km north-west) and Walton (Merseyside) (2.4 km south-west). 33 stations lie within 10 km in all. At 87.6%, Fazakerley is less punctual than all of them; the best of the five, Old Roan, manages 95.4%.
Fazakerley takes its name from a suburb called Fazakerley, home to about 16,786 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Fazakerley was Period 8 of 2024-25, at 82.0%, some time before the latest year. The strongest was Period 4 of 2023-24, at 97.4%, and the two are 15.4 percentage points apart. Cancellations peaked at 11.0% of scheduled stops in Period 8 of 2023-24, against 1.8% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Fazakerley on 87.6%. The comparison group includes Kirkby (Merseyside) (89.4%), Hindley (80.6%) and Rice Lane (90.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 43,024 | 87.6% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Fazakerley? Delay Repay
These operators call at Fazakerley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,308 | 92.0% | 1.4% |
| Period 6 of 2026-27 | 3,327 | 91.2% | 0.9% |
| Period 5 of 2026-27 | 3,308 | 88.3% | 1.1% |
| Period 4 of 2026-27 | 3,122 | 86.6% | 1.2% |
| Period 3 of 2026-27 | 3,057 | 88.7% | 5.1% |
| Period 2 of 2026-27 | 3,321 | 90.5% | 1.1% |
| Period 1 of 2026-27 | 3,660 | 88.7% | 4.2% |
| Period 13 of 2025-26 | 3,639 | 88.9% | 1.4% |
| Period 12 of 2025-26 | 3,315 | 84.7% | 0.7% |
| Period 11 of 2025-26 | 3,326 | 84.4% | 1.9% |
| Period 10 of 2025-26 | 3,002 | 87.4% | 0.7% |
| Period 9 of 2025-26 | 3,310 | 84.2% | 1.5% |
| Period 8 of 2025-26 | 3,329 | 83.6% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kirkby (Merseyside) | 43,024 | 89.4% | 1.8% |
| Hindley | 43,045 | 80.6% | 3.1% |
| Rice Lane | 42,982 | 90.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out