Enfield Town
ENFLondonManaged by London Overground
How this station is performing
Enfield Town had 32,420 scheduled stops to Period 7 of 2026-27, about 89 a day. 95.7% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Enfield Town opened on 1 March 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Enfield Town is the oldest; the next oldest, Enfield Chase, dates from 1871.
The nearest stations to Enfield Town are Enfield Chase (0.8 km west), Bush Hill Park (1.3 km south-east), Grange Park (1.5 km south-west), Gordon Hill (1.7 km north-west) and Southbury (1.8 km east). 47 stations lie within 10 km in all. At 95.7%, Enfield Town is more punctual than every one of them; the best of the five, Southbury, manages 93.4%.
Enfield Town is named after Enfield, an area of London, home to about 156,858 people, but the station stands 0.2 km from its centre.
Enfield Town is among the most punctual stations in Britain. Its 95.7% puts it 99th out of 2,374 ranked stations, with 98 ahead of it and 2,275 behind, and 11.8 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in London, Enfield Town is the most punctual, at 95.7%. The comparison group includes Catford (90.8%), Ravensbourne (91.3%) and Beckenham Hill (90.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 32,420 | 95.7% | 2.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,357 | 95.6% | 2.0% |
| Period 6 of 2026-27 | 2,472 | 95.2% | 2.3% |
| Period 5 of 2026-27 | 2,546 | 94.8% | 3.1% |
| Period 4 of 2026-27 | 2,350 | 92.5% | 3.6% |
| Period 3 of 2026-27 | 2,553 | 94.3% | 1.4% |
| Period 2 of 2026-27 | 2,495 | 97.5% | 0.3% |
| Period 1 of 2026-27 | 2,876 | 95.9% | 2.6% |
| Period 13 of 2025-26 | 2,474 | 96.4% | 1.1% |
| Period 12 of 2025-26 | 2,556 | 95.4% | 2.5% |
| Period 11 of 2025-26 | 2,574 | 97.3% | 0.5% |
| Period 10 of 2025-26 | 2,024 | 96.5% | 3.0% |
| Period 9 of 2025-26 | 2,511 | 96.8% | 2.7% |
| Period 8 of 2025-26 | 2,632 | 95.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Catford | 32,761 | 90.8% | 4.1% |
| Ravensbourne | 33,123 | 91.3% | 4.0% |
| Beckenham Hill | 33,127 | 90.6% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out