Rotherhithe
ROELondonManaged by London Overground
How this station is performing
Rotherhithe had 209,634 scheduled stops to Period 7 of 2026-27, about 576 a day. 91.1% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Rotherhithe opened on 7 December 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, South Bermondsey is the oldest (1866) and Canada Water the newest (1999), with Rotherhithe in between.
The nearest stations to Rotherhithe are Canada Water (0.4 km south-east), Wapping (0.5 km north-west), Surrey Quays (0.9 km south), Shadwell (1.2 km north) and South Bermondsey (1.4 km south). 141 stations lie within 10 km in all. At 91.1%, Rotherhithe is less punctual than all of them; the best of the five, South Bermondsey, manages 94.1%.
Rotherhithe takes its name from an area of London called Rotherhithe, home to about 13,743 people, and the station stands 0.7 km from its centre.
For Rotherhithe, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 88.5% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2025-26, at 95.7%, which is 7.2 percentage points higher. Cancellations peaked at 10.6% of scheduled stops in Period 5 of 2026-27, against 3.7% over the latest 13 periods.
Compared with 3 stations of a similar size in London, Rotherhithe is the least punctual, at 91.1%. All of them are ahead, including Haggerston (91.4%), Hoxton (91.9%) and Shadwell (92.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 209,634 | 91.1% | 3.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 16,192 | 88.5% | 2.5% |
| Period 6 of 2026-27 | 15,449 | 88.9% | 5.1% |
| Period 5 of 2026-27 | 15,600 | 90.2% | 10.6% |
| Period 4 of 2026-27 | 16,089 | 91.8% | 5.2% |
| Period 3 of 2026-27 | 16,340 | 91.4% | 2.8% |
| Period 2 of 2026-27 | 15,854 | 92.1% | 3.9% |
| Period 1 of 2026-27 | 18,739 | 92.1% | 3.4% |
| Period 13 of 2025-26 | 16,629 | 93.4% | 2.7% |
| Period 12 of 2025-26 | 16,120 | 92.8% | 2.8% |
| Period 11 of 2025-26 | 16,259 | 90.9% | 2.7% |
| Period 10 of 2025-26 | 14,481 | 92.5% | 1.9% |
| Period 9 of 2025-26 | 16,093 | 88.9% | 2.6% |
| Period 8 of 2025-26 | 15,789 | 90.1% | 2.5% |
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Haggerston | 209,634 | 91.4% | 3.9% |
| Hoxton | 209,634 | 91.9% | 3.9% |
| Shadwell | 209,634 | 92.2% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out